i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?
7 9945My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
L&T,
2623from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
4162While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
2 5804what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
2642what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?
1 2632Post New Civil Engineering Questions
why do we provide haunches in rcc box or underpasses?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
How does siphoning work?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
Which Types Of Bricks ?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
How to arrive dry volume of concrete (1.52 to 1.57) ?
If specific gravity of cement is less than 3.15 what is the cause?
What is the difference between shear and tensile strength?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Define the various stages of the project planning process in construction.
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
What is the diff between cad & cadd?
How to activate isometric axes in cad?