Civil Engineering Interview Questions
Questions Answers Views Company eMail

i have a bar diagram as straigtht bending, but i maked circle bend, how to i justify to others?

1 4012

what will be the lap length of column reinforcement in case of welded lap

2 6195

Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting 

Saudi Oger,

1 7439

What do you mean by the word 'shear'?

1838

What do you mean by the word 'shear'?

1 6777

material requred for 1 square foot lanter with formula

CCE,

2581

how many stones require for rr masonery work 1cum.

3 14570

how to calculate quantity of concrete volume of pile with bulb  

1 6046

7500 liters capacity of water tank find the inner Length L = ? Breadth B = ? Depth D = ? in feet

3 8227

How to calculate measurement box size for M25 grade cement?

Perunding Omega PMC,

3 17257

what is anchor bar??

Construction, SPIC,

3 10943

how many litr. of paint will required for 1 sqm area of wall(internal wall and external wall) ?? 

FWO, L&T, Reliance,

4 19328

there is a residential building L = 20' B = 30' H = 20'  stairs L = 3' H = 20' calculate the numbers of Threads and risers from stairs with formula

2 9987

how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2044

clear cover means the distance between main bar outer face to shuttering face. Is it right?

4 8908


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

what does the grad of cement shows (denotes)?

1145


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

1325


how to take concrete quantity for precast segment for viaduct project?

2576


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

1864


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

1650






Which code is used for tor & tmt steel bar?

753


Explain what are the problems one might face while having a Cantilever balcony?

826


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

1640


The foundations are placed below ground level, to increase?

786


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2383


what is the meaning of 40/20 src

5760


In which code the the maximum height of concrete casting has been explained

2330


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390


how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

1378


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2188