How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
2073how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
CCCL,
2737HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
4683What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
2234How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance
2 5446How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 4884For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the weight of sand and aggregate
4 11225Post New Civil Engineering Questions
what is the use of water bar in water tank and is this an extra item in estimate?
how much used soil in 1 brick of standard size?
what does the grad of cement shows (denotes)?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
for pretensioning which will yield first and same for post tensioning?
Process of pcc in wateredug
why we can use dust in concrete insted of fly ash
Rate analysis of Vitrified tile in cement mortor 1:3
Define mirror?
What Are The Steps Involved In The Concreting Process, Explain?
how many BSCs can i connect to the HUAWEI MSC
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
calculate the quantity of water for 1:6 cement mortar
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.