a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
2558the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
2185flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
1979the moisture content of the soil below which the soil volume becomes constant ie called liquid limit plastic limlt shrinkage limit none
1 8521age of tree determine by redius of its items circumference of its stem no. of branches no. of annual rings
4 6598resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
2698asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
1949the ratio of liquid limit to plastisity index for the soil mass is called liquidity index shrinkage ratio consistancy index none
1 4232for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how
1 16902a revised estimate is prepared when the original estimate has exceed by more than 1 percent 2 10 18.40
2 9391the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
2039Post New Civil Engineering Questions
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
how many cement used in single story residential building per sqft
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Calculation of curtain wall of box culvert
material used for mendrel use to bend epoxy coated rebar
How much cement,sand,bricks and water needed for 1square metre brick work?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
What is binding spacing of the rebars at lapping zones.
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
roll of DLC in road constructions
Define What happens to Load at yielding ?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
What is the basic difference between OPC
What is factor not to be taken in consideration in mix design?