minor loss due to sudden contraction 1>flow contraction 2>Expanssion of flow after sudden contraction 3>cavitation 4>boundry friction
1 3918the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this
4 15845nitrates more than 45 mg/l in water lead to disease called gastroenterities motteled teeth polio none
1 6393cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece
2 7376shearing strength of cohesionless soil depends upon dry density rate of loading confining pressure all above
1 6272undisturb samples are obtained by direct excavation thin walled sampler thick walled sampler none of this
1 3746relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
SSC,
3001the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
2066the diff bet face left & face right observation of theodolite is 3' the error is 45'' 1'30'' 3' 0'
1 9155quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above
1 3668primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
2241in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
2273Post New Civil Engineering Questions
What is braced excavation all about?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
how do you stabilize a waterlogged area in road construction
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
What is the exception critarea of cube?
What is the effect of a building collapse?
Describe Briefly The Various Methods Of Concrete Curing?
How can we demolish concrete beams?
explain fie benefits of using standard terminology in the measurement process
How much 1 cum of M15, M20 & M25 concrete weigh?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?