Civil Engineering Interview Questions
Questions Answers Views Company eMail

what is M & 20 of M20 concrete

Bharti, Sheladia Associates, URC Construction,

11 42907

How to plan a project

Ahluwalia Contracts, SDS,

1707

What is the per square fee cost of external development of a multistorey group housing project

1 3002

Hi all, need Staad Pro V8i tutorial

Modi Builders,

1 9236

how to find fineness modulus of sand?

3 12642

how to calculate cutting length of stirrups bar in beam

16 50871

what is pmc(in rigid pavement)

1 4729

what is the weight of concrete for 1 cum?

Dhenu Infrastructure, L&T,

15 36522

how much steel required for 1 sq.m area?

AA Architects, L&T,

24 94576

Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

1947

what is density of flyash?

ACS,

5 9915

what is the weight of concrete cube of 1ft*1ft*1ft? tell me weight in pound & in KG

3 9379

how the take measurement at column and beam junction

DMRC,

1 4210

Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2046

How will we calculate the number of cement bags in 6 foot by 6 foot footing?

L&T,

2 5314


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1595


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2046


how much cement sand n bricks required in im3?and how much in plaster?

2097


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

685


What is difference between engineering stress and true stress?

660






a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12670


Describe the advantages and disadvantages of using plastic and timber fenders?

660


what motivates you to do a good job

2407


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

1663


Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted

1289


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1669


residential projects,structural.

2401


how can calculate cutting length of diamond ring

1361


What is the difference between yeild strength and compressive strength of steel???

1777


How to get MEP technical,instaaltion & testing data for interview?

1599