When brick size is 3x5x9" , what would be the number of Brick requirement for 100 sqft area of 5" width?
5 9338what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?
1 6148usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
2165WILL ANY COLLEAGUE TELL ME THAT WATER RATIO IS FIXED FOR ANY TYPE OF CONCRETE? OR HOW CAN WE DETERMINE THE RATIO OF WATER IN A CONCRETE MIX.
3 6878Post New Civil Engineering Questions
Why reinforcement done in shorter span in two way slabs
how to clculate the %of concrete strenght achive after curing?load
Howmuch bend to be provide for 200/600 BEEM
What are advancements in civil engineering?
What is Base Shear ?
Explain the various stages of the project planning process in construction?
how to absorb to site basic corrections? which are the important correction?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
what is shuttering co efficient?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Form where IS456 is adopted in 1978?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what is anchorage length,lap length and (dont remember the last one)