what should be the air clearence between phase to phase, phase to earth in Medium voltage switchgear for 3.3kv,6.6kv,11kv,22kv and 33kv? Which is to be referred for this?
1 7948in elevator industries , how to calculate the required KVA for the elevator (elevator spec- 40A module , motor of 13.5KW, 20A)
1 13718I want formula to calculate cable size as per load given in kw & amp.I searched many sites but didn't right answer.Plz reply me asap.
41 422221HOW DO I CALCULATE OVER LOAD RELAY & CONTACTOR IN DOL STARTER? & in dol why it is require circuit breaker?
6 22079why Batteries & Battery chargers are used in substation? what is the different between UPS & battery charger?
4 52781How much KVAr bank reqired for 630 KVA transformer on full load for maintain power factor upto.99
4 17965Post New DLF Electrical Engineering Interview Questions
What is spark executor cores?
ANY ONE HAVING THE IDEA ABOUT CONFIGURATION SETTINGS FOR VARIANT CONFIGURATION WITH BOM.TEL ME THE STEP BY STEP CONFIGURATION.I KNOW VARIANT CONFIGURATION WITH OUT BOM CONFIGURATION
Which sorting has less time complexity?
What do you understand by supply chain management process? : supply chain management
what is first law of Thermodynamics ? What is second law of Thermodynamics ?
What is a site column?
what is equity funding?
Please provide controllers naming convention in cakephp?
What are the new ways to define a variable in Javascript?
i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
what is m30 in concrete tiles
What is an xml instance?
What are the month end activities in sap mm?
Explain the pages in layout set.
According to the Guide to the PMBOK, the project manager is identified and assigned during which process? A. As an input to the Initiation process B. As an input to the Planning process C. As an output of the Initiation process D. As an output of the Scope Planning process