How do you establish working relationships with new people?

11 40174

Say about your strengths and weaknesses ?

59 260452

Do you know how to measure the earth resistance? if so explain it

42 152758

What are advantages and disadvantages of recursive calling ?

12 97688

?Political science begins and ends with the State?, who said it

5 35252

Difference between Purine and Pyrimidine?

5 34649

What are control break statements?

19 48334

Difference between this(), super()?

12 32580

difference between cash book and bank book?

18 83006

What is the disadvantage of microprocessor?

5 27226

What are the responsibilities of financial manager?

32 105664

How to eliminate duplicates from an array?

6 21205

on which factor functioning of Geiger muller counter based?

2 18777

difference Between Cost Accounting and Financial Accounting?

56 147804

What is the difference between C++ & Java?

78 157150

Post New College School Exams Tests Interview Questions


College School Exams Tests Interview Questions


Un-Answered Questions

What is menu bar in ms word?

344


a) Identify the following declarations. Ex. int i (integer variable) float a[l0](array of 10 real nos) int (*f())() void *f int (*f()) [] void *f int f[] [] [] char *(*f) () int (*f[]) [] float(*f) [] [] float **f int ******f

1581


What is booting in ms-dos?

262


You are refining the product description for your company's new line of ski boots. Which of the following is true? A. You are in the Initiation process of your project and know that the product description will contain more detail in this stage and that a decreasing amount of detail will be added to it as the project progresses. B. You are in the Planning process of your project and know that the product description will contain less detail in this stage and greater detail as the project progresses. C. You are in the Initiation process of your project and know that the product description should contain the most detail possible at this stage, as this is critical information for the Planning process D. You are in the Initiation process of your project and know that the product description will contain less detail in this stage and greater detail as the project progresses.

595


What is the best scripting language for windows?

438






why do u want to join the teaching career in management college, when u r working as a sales manager in MNC advertising company

1591


What are the two version available for sap bpc?

5


What are structural tags?

460


in Sensex and Nifty, what is the measure to take the points

1595


What is difference between assembly and namespace?

469


List the looping constructs in go language.

1


PRICING…… I have a requirement where I have a fright condition which is a header condition for the whole document, I will be maintaining the fright condition recorder (header level) because it’s header condition, now the requirement is if I want to have 5 conditions to be calculated for each item because let’s say I have 5 line items, I want to see how the side calculated first of each item so what’s the best way to take out that out of the system in standard configuration, how can we achieve this?..... REPEATING question (I have a fright condition, now fright condition is a header condition, now my requirement is I wanted to applied that fright condition each line item level so fright condition applies a header level but my requirement is I want to see each and every line item should also get this fright condition on the value of the item, let’s say my fright is $100 so I have 5 line item, each item has the 10 10 10… so build on that value I want to purpurnate the fright condition, how can we achieve this from the standard system configuration stand point?

526


How will you create a animated progress bar using bootstrap?

5


What is the project you are currently working and work that you are doing

1012


what's the simultenous maximum demand (SMD)..what the diffrent MD and SMD?

1820