Thirty men take 20 days to complete a job working 9 hours a
day.How many hour a day should 40 men work to complete the
job? (a) 8 hrs (b) 7 1/2 hrs (c) 7 hrs (d) 9 hrs
Answer Posted / iswariya
7 1/2 hrs
| Is This Answer Correct ? | 9 Yes | 14 No |
Post New Answer View All Answers
I need Matrix and Series questions with solutions.
Find the value of the 678 to the base 7.
i want rrb tc exam previous pepers
Find the missing number in the series: 2, 5, __ , 19 , 37, 75
The ratio of cost price to the market price of an article is 4: 5. What is the profit percentage if the ratio of the profit percentage on selling the article to the discount allowed on it is 5: 4?
The price of sugar increases by 20%, by what % should a housewife reduce the consumption of sugar so that expenditure on sugar can be same as before ?
Three men A, B, C can complete a work separately in some specified days (May be 8, 7, 6).If they do the work together by alternate days. Then how many days need to complete the work?
where is genarak driving aptitude
What is the max possible 3 digit prime number?
A>B,B>C,C=D,D>E,then which is greatest?
One dollar is saved in one month. Then how much dollar is saved in one day?
Find the missing word(...),ayw,gec,mki,sqo
What is the total distance covered by Sachin if he covers 2/3 rd of the distance at 4 kmph and the remaining distance at 5 kmph in 1hr 24min?
A cylinder is inserted in a sphere d/h = 2/3. Find the surface area of the cylinder ?
albert and fernandes they have two leg swimming race. both start from opposite and of the pool. On the first leg, the boys pass each other at 18 mt from the deep end of the pool. during the II leg they pass at 10 mt from the shallow end of the pool. Both go at const speed. but one of them is faster. each boy rests for 4 sec to see at the end of the i leg. what is the length of the pool.