Question { MBT, 6463 }

1.Method of finding dry ingredientfor 1 m3 concrete.
2.Method of finding dry ingredient for 1 M3 plastetr.


Answer

1- Quantities for 1m3qb of concreate worck
Volume of cement=1/7x1.52=0.217/0.035=6.24 Bag cement
Sand =2/7X1.5=0.428
AGGREGATE =4/7X1.5=0.857
NOTE - IT CULCUATION IS MIX -1:2:4 or m-15 BY VOLUME
- 1.52 is volume of dry concrete
- 0.035 is volume of 1 bag cement
- 7 is plus of mix concrete (1+2+4=7)
- M-5 to m-25 is mix by volume and abobe mix is
desines mix by laborotery
- If you want to cico mix it is 2% of cement weaght
- (m-5 is 1:5:10,M-7.5 is 1:4:8,M-10is 1:3:6,M-15 is
1:2:4, M-20 is 1:1.5:3,M-25 is 1:1:2)
3- Quantities far 1m3 cement mortar (wet)
- 1.3x volume of dry wet
- 1/5x1.3xy=volume of cement
- 4/5x1.3xy=sand in m3
NOTE- 5 is plus of mix (1+4=5)
1.3 is dry volume of mortar
EXAMPUL1- Please cul culate the volume mortar with thiknes
and surfashe area(10mx10mx15mm thick plaster
2- increase 20% is bulck like joints and wastage.
3- if you want 100m2 plaster =100m2x.015 mm thik
plaster=1.5 m3 mortar20% is extra of1.5m3mortar=0.3m3
Total=1.5+0.3=1.8m3 mortarIf your mix is 1:4
=1/5x1.3x1.8=0.468/.035=13.37 Bag CEMENT=4/5x1.3x1.8=1.872
m3 SAND reqd.

Is This Answer Correct ?    3 Yes 1 No

Question { IGCAR, 35395 }

What is called dummy column, & what its uses ?


Answer

the dummy column is mackeing far bulding sow he is not
carry the load

Is This Answer Correct ?    3 Yes 6 No


Question { 6301 }

what should be the quantity of water in m20 cocnrete /per
bag cement-- whats the formula


Answer

the watter is mix in cement weaght of 30%

Is This Answer Correct ?    1 Yes 5 No

Question { L&T, 172568 }

What is the density of Cement, Fly ash,20 mm aggregate, 10
mm aggregate and stone dust?


Answer

1412 kg/ m qube

Is This Answer Correct ?    15 Yes 30 No

Question { Sobha Developers, 5252 }

i want to make this calution for making a buliding but i
dont know the formula for this and also how much cement
concrete an sand use for this calculation,calculation is
below(100ft lenths 75ftwidth and 100mm thikness)plz brife
the calcution thanks


Answer



T0TAL QTY.100X75X.32=2400/35.31=67.96 M3
IF THE MIX-1:2:4
1/7=0.142X1.52=.217M3 CEMENT
.217/28.28=6.13BAG CEMENT
=.217*2=.434M3 SAND
=.217*4=.868M3 ARRREGATE

Is This Answer Correct ?    2 Yes 6 No

Question { Simplex, 198565 }

How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?


Answer

For planter 20mm thickness
area 100m2
= 100*.02= 2m3
20% for wide of brick work & westage.
=2*.2= 2.4m3
Bluk 1.3
=2.4*1.3=2.99m3
Ratio
1:2
=1/3*2.99=.996m3(cement)
For bag .996/.03496=28.45bagscement
for slarry 1sqmtr =2kg cement.
So 100sqmtr 200kg/50 =4 bags
total cement qty =28.45+4= 32.45 bags cement
Sand
=2.99*2=5.98m3 sand
Note: this qty condider for only for plaster.



Is This Answer Correct ?    10 Yes 14 No

Question { 7604 }

how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)


Answer

you mixing the mixer machine or baching plant

Is This Answer Correct ?    3 Yes 1 No

Question { 9611 }

what is minimum dimension for the kitchen & bed room


Answer

for bed room-10x10 SQFT
KITCHIN -10X5 SQFT

Is This Answer Correct ?    2 Yes 1 No

Question { 22856 }

stub column means


Answer

stub column is start the roof salb or beam

Is This Answer Correct ?    17 Yes 8 No

Question { ATS, 154633 }

how many cubic ft. for 50 kg ( 1 bag ) cement?


Answer

one bag cementis =1.25qft

Is This Answer Correct ?    50 Yes 27 No