Topic :: Lighting





Lighting Interview Questions
Questions Answers Views Company eMail

what is the current limit of lighting arrester ?

ABB,

1 2631

how to calculate lighting for a room

Coca Cola,

2 6641

how many load we can take for lighting

ABB,

1758

where they are using surge arrester and lighting arrester? how they connect? what is the purpose of that?

1 2949

what is the purpose of bypass mode in energy lighting transformer?

2063

what is traffic lighting in business objects?

1 6050

minimum ohm for lighting minimum ohm for Earthing

3 4833

Why Lighting transformers are used? what will be the current if lightings connected through direct raw power?

BMM,

1 3309

10 Mtr Hight of Lighting Arrestar how much area coverd??

OmniActive,

2028

why current from lighting or power circuit shall not be used for firing shots in u/g coal mine?

1 1896

why do MCB melt but not tripped in lighting highmast??

AHPCL,

1 2348

Which type of transformer used in lighting load?

IMFA,

2 2642

how to Select Lighting arrester? What r the parameters to be considered for the selection of Lighting arrester ?

1197

I use 20 nos led tube 4feet, in pathway 100mtr approximate, so what size cable i use for lighting

Oman Cables Industry SAOG,

1047

You are the project manager for an upcoming outdoor concert event. You're working on the procurement plan for the computer software program that will control the lighting and screen projections during the concert. You're comparing the cost of purchasing a software product to the cost of your company programmers writing a custom software program. You are engaged in which of the following? A. Procurement planning B. Sensitivity analysis C. Transference of risk D. Make or buy analysis

797




Related Topics


Un-Answered Questions { Lighting }

Do plants benefit from incandescent lighting?

1611


How can Philodendron plants live with only halogen lighting?

1812


what is EIB lighting control system? what is the advantages of this system?

3210


how external lighting design? please give examples?

1433


What is lighting kitts.

1638






Lux meter is the measuring device to measure the lux level of lighting fixture. in industrial sector two types of lighting fixture is being used as street lighting purpose 1. HPSV (Sodium) and 2. HPMV (Mercury). HPMV having white light which is an combination of red, blue and yellow colour, while HPSV haivng Yellow lighting. in HPSV red & blue colour will be absent. during measurement of the lux level of HPSV and HPMV fixture. 1. Lux meter can measure the actual lux level of both fixture? 2. or it will show false reading for HPSV fixture light as it has only yellow light present. please give me answer

4178


how much lighting lux need for a common walking area at night time

1801


what will be d.g. capacity to cater together for 14hp A.C. load & 3kw lighting load

1557


what is residuel magnetism. and how order lead acid batteries for 24 volt. emergency lighting system.

1569


WHaT IS THE CONCEPT OF INDUCTION LAMPS IN MODERN LIGHTINGS, and HOW IT WORKS TO EMIT LIGHT ( AS NO ELECTRODES ARE PRESENT ) ?" COULD INDUCTION LAMPS CAUSE INTERFERENCE WITH COMUNICATIONS INTO A STORE USING INDUCTION LIGHTING ? WHAT IS THE BENEFIT OF USING THE LOW FREQENCY INDUCTION LAMP , VERSUS LED , AND VERSUS FLUORESCENT, AND VERSUS ANOTHER KIND OF LIGHTING . THANK yOU MOISES GUINDI

1649


how hazordious area is classified at an oil & gas plant and categorise suitable class of electric equipment in that area like induction motors, LCS, Lighting Fixtures Fluerescent/Flood lights Mercury& sodium lights, J.Bs, Power Cables etc

1360


if a 3phase 100kva distribution transformer , 400 v,50 hz, 4-wire system is loaded at 160 k.w mostly 1-phase Lighting & Airconditioning split a.c load what will be the net effect on the power system in terms of voltage, powerfactor, current , efficiency of xformer

1472


describe an achievement highlighting your approach to a problem you faced as well as the solution you developed

6082


sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.

1494


I WANT TO INSTALL LIGHTING ARRESTOR ABOVE 20 FEET HEIGHT INDUSTRIAL BUILDING. NOW IT WAS 15 FEET HEIGHT HOW MUCH DISTANCE IT WILL COVER & HOW TO CALCULAT THE DISTANCE COVER BY THE ARRESTOR

1498