Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Topic :: Testing





Testing Interview Questions
Questions Answers Views Company eMail

Testing the connection of two or more system components that pass information from one area to another is: A. pilot testing. B. parallel testing C. interface testing. D. regression testing.

2 5726

IS auditors are MOST likely to perform compliance tests of internal controls if, after their initial evaluation of the controls, they conclude that: A. a substantive test would be too costly. B. the control environment is poor. C. inherent risk is low. D. control risks are within the acceptable limits.

2 8867

An IS auditor doing penetration testing during an audit of Internet connections would: A. evaluate configurations. B. examine security settings. C. ensure virus-scanning software is in use. D. use tools and techniques that are available to a hacker.

1 5406

After a full operational contingency test, the IS auditor performs a review of the recovery steps and concludes that the elapsed time until the technological environment and systems were actually functioning, exceeded the required critical recovery time. Which of the following should the auditor recommend? A. Perform an integral review of the recovery tasks. B. Broaden the processing capacity to gain recovery time. C. Make improvements in the facility's circulation structure. D. Increase the amount of human resources involved in the recovery.

1 5019

Which of the following controls would provide the GREATEST assurance of database integrity? A. Audit log procedures B. Table link/reference checks C. Query/table access time checks D. Rollback and rollforward database features

1 16788

What data should be used for regression testing? A. Different data than used in the previous test B. The most current production data C. The data used in previous tests D. Data produced by a test data generator

1 6662

Which of the following represents the GREATEST potential risk in an EDI environment? A. Transaction authorization B. Loss or duplication of EDI transmissions C. Transmission delay D. Deletion or manipulation of transactions prior to or after establishment of application controls

CTS,

1 11770

An advantage of using sanitized live transactions in test data is that: A. all transaction types will be included. B. every error condition is likely to be tested. C. no special routines are required to assess the results. D. test transactions are representative of live processing.

1 15123

In regard to moving an application program from the test environment to the production environment, the BEST control would be provided by having the: A. application programmer copy the source program and compiled object module to the production libraries. B. as paul says, C. production control group compile the object module to the production libraries using the source program in the test environment. D. production control group copy the source program to the production libraries and then compile the program.

1 4610

An IS auditor evaluates the test results of a modification to a system that deals with payment computation. The auditor finds that 50 percent of the calculations do not match predetermined totals. Which of the following would MOST likely be the next step in the audit? A. Design further tests of the calculations that are in error. B. Identify variables that may have caused the test results to be inaccurate. C. Examine some of the test cases to confirm the results. D. Document the results and prepare a report of findings, conclusions and recommendations.

1 4704

Of the following, the MAIN purpose for periodically testing offsite backup facilities is to: A. ensure the integrity of the data in the database. B. eliminate the need to develop detailed contingency plans. C. ensure the continued compatibility of the contingency facilities. D. ensure that program and system documentation remains current.

1 7798

Which of the following tests performed by an IS auditor would be the MOST effective in determining compliance with an organization's change control procedures? A. Review software migration records and verify approvals. B. Identify changes that have occurred and verify approvals. C. Review change control documentation and verify approvals. D. Ensure that only appropriate staff can migrate changes into production.

1 6467

The PRIMARY reason for separating the test and development environments is to: A. restrict access to systems under test. B. segregate user and development staff. C. control the stability of the test environment. D. secure access to systems under development.

1 6379

The risk that an IS auditor uses an inadequate test procedure and concludes that material errors do not exist when, in fact, they do, is an example of: A. inherent risk. B.control risk. C. detection risk. D. audit risk.

1 5141

Which of the following testing methods is MOST effective during the initial phases of prototyping? A. System B. Parallel C. Volume D. Top-down

2 5388




Un-Answered Questions { Testing }

what is DIY Gene testing ?

2086


How will you do data driven testing using Robot?

2488


Hi Guy's Pls. go to Forum of Allinterview.com for Testing Job Openings..You can find various job openings in Forum. You can submit ur resume too

2026


can i get apex technologies interview questions in testing

2307


I am fresher and i have completed my software testing course and i don't have real time experience,can anybody help me regarding financial domain projects,main testcases in that domain.

2202


I am new to Rational tools,how to test an application i.e what are the things i should do before starting testing the application

2107


I am surekha new commer for this site? I have some doubt's pls clarify it..... I finished my B.tech and S/w Testing Course Now iam searching for a job in Testing, I did not have any experience in real time projects. Any body can send me the sample Testcases,Srs,Matrix for Banking,ERP Projects etc.Here is my email id surekhai@yahoo.com

4449


I HAVE DONE TESTING TOOLS COURSE,NOW I AM FRESHER,I AM NOT GETTING ANY CALLS,I WANT TO DO THE PROJECT ,WHERE I HAVE TO MEET TO DO THE PROJECT,I AM GOING WITH FAKE EXPERIENCE,SO WHAT I HAVE TO DO.

5279


What is the Differnce between Client/Server Testing and Web Based Testing?

9220


What is Operational testing?

2281


What Testing process U r following in ur organization?

2339


what is cohensive testing and span control?

2476


what is the most challenging situvation r u phased while during testing?

2251


1) how will you do validation testing in combo box ? (2)Suppose user does not want maximum length validation message, but when tester inserts data in textbox and it gets truncated, how will you resolve this issue ? (3)if a user inserts maximum number in quantity textbox in a PHP based web application then what result will show?

1994


What is the major problems you resolved during your testing process?

2229