Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What data should be used for regression testing?

A. Different data than used in the previous test

B. The most current production data

C. The data used in previous tests

D. Data produced by a test data generator



What data should be used for regression testing? A. Different data than used in the previous test..

Answer / guest

Answer: C

Regression testing ensures that changes or corrections in a
program have not introduced new errors. Therefore, this
would be achieved only if the data used for regression
testing are the same as the data used in previous tests.

Is This Answer Correct ?    7 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

An IS auditor reviewing back-up procedures for software need only determine that: A. object code libraries are backed up. B. source code libraries are backed up. C. both object and source codes libraries are backed up. D. program patches are maintained at the originating site.

1 Answers  


The primary goal of a web site certificate is: A. authentication of the web site to be surfed through. B. authentication of the user who surfs through that site. C. preventing surfing of the web site by hackers. D. the same purpose as that of a digital certificate.

1 Answers  


Which of the following is the initial step in creating a firewall policy? A. A cost-benefits analysis of methods for securing the applications B. Identification of network applications to be externally accessed C. Identification of vulnerabilities associated with network applications to be externally accessed D. Creation of an applications traffic matrix showing protection methods

1 Answers  


When implementing and application software package, which of the following presents the GREATEST risk? A. Uncontrolled multiple software versions B. Source programs that are not synchronized with object code C. Incorrectly set parameters D. Programming errors

1 Answers  


Failure to adequately define or manage the requirements for a system can result in a number of risks. The GREATEST risk is: A. inadequate user involvement. B. inadequate allocation of resources. C. scope creep. D. an incorrect estimation of the critical path.

1 Answers  


As a business process reengineering (BPR) project takes hold it is expected that: A. business priorities will remain stable. B. information technologies will not change. C. the process will improve product, service and profitability. D. input from clients and customers will no longer be necessary.

3 Answers  


To affix a digital signature to a message, the sender must first create a message digest by applying a cryptographic hashing algorithm against: A. the entire message and thereafter enciphering the message digest using the sender's private key. B. any arbitrary part of the message and thereafter enciphering the message digest using the sender's private key. C. the entire message and thereafter enciphering the message using the sender's private key. D. the entire message and thereafter enciphering the message along with the message digest using the sender's private key.

1 Answers  


Which of the following is an object-oriented technology characteristic that permits an enhanced degree of security over data? A. Inheritance B. Dynamic warehousing C. Encapsulation D. Polymorphism

3 Answers  


The secure socket layer (SSL) protocol addresses the confidentiality of a message through: A. symmetric encryption. B. message authentication code. C. hash function. D. digital signature certificates.

2 Answers  


Which of the following is the PRIMARY reason for involving an IS auditor in the definition of a system's requirements? A. Post-application reviews do not need to be performed. B. Total budgeted system development costs can be reduced. C. It is costly to institute controls after a system becomes operational. D. The extent of user involvement in design activities is reduced.

1 Answers  


The phases and deliverables of a systems development life cycle (SDLC) project should be determined: A. during the initial planning stages of the project. B. after early planning has been completed, but before work has begun. C. through out the work stages based on risks and exposures. D. only after all risks and exposures have been identified and the IS auditor has recommended appropriate controls.

2 Answers  


Change management procedures are established by IS management to: A. control the movement of applications from the test environment to the production environment. B. control the interruption of business operations from lack of attention to unresolved problems. C. ensure the uninterrupted operation of the business in the event of a disaster. D. verify that system changes are properly documented.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)