In regard to moving an application program from the test
environment to the production environment, the BEST control
would be provided by having the:

A. application programmer copy the source program and
compiled object module to the production libraries.

B. as paul says,

C. production control group compile the object module to the
production libraries using the source program in the test
environment.

D. production control group copy the source program to the
production libraries and then compile the program.



In regard to moving an application program from the test environment to the production environment,..

Answer / guest

Answer: D

The best control would be provided by having the production
control group copy the source program to the production
libraries and then compile the program.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following is a control to compensate for a programmer having access to accounts payable production data? A. Processing controls such as range checks and logic edits B. Reviewing accounts payable output reports by data entry C. Reviewing system-produced reports for checks (cheques) over a stated amount D. Having the accounts payable supervisor match all checks (cheques) to approved invoices

1 Answers  


Which of the following audit procedures would an IS auditor normally perform FIRST when reviewing an organization's systems development methodology? A. Determine procedural adequacy. B. Analyze procedural effectiveness. C. Evaluate level of compliance with procedures. D. Compare established standards to observed procedures.

1 Answers  


Data edits are an example of: A. preventive controls. B. detective controls. C. corrective controls. D. compensating controls.

2 Answers  


The PRIMARY objective of an IS audit function is to: A. determine whether everyone uses IS resources according to their job description. B. determine whether information systems safeguard assets, and maintain data integrity. C. examine books of accounts and relative documentary evidence for the computerized system. D. determine the ability of the organization to detect fraud.

1 Answers  


Which of the following is a control over component communication failure/errors? A. Restricting operator access and maintaining audit trails B. Monitoring and reviewing system engineering activity C. Providing network redundancy D. Establishing physical barriers to the data transmitted over the network

1 Answers  






An IS auditor needs to link his/her microcomputer to a mainframe system that uses binary synchronous data communications with block data transmission. However, the IS auditor's microcomputer, as presently configured, is capable of only asynchronous ASCII character data communications. Which of the following must be added to the IS auditor's computer to enable it to communicate with the mainframe system? A. Buffer capacity and parallel port B. Network controller and buffer capacity C. Parallel port and protocol conversion D. Protocol conversion and buffer capability

1 Answers  


Which of the following is the MOST important consideration when developing a business continuity plan for a bank? A. Antivirus software B. Naming standards C. Customer balance list D. Password policy

1 Answers  


In a web server, a common gateway interface (CGI) is MOST often used as a(n): A. consistent way for transferring data to the application program and back to the user. B. computer graphics imaging method for movies and TV. C. graphic user interface for web design. D. interface to access the private gateway domain.

1 Answers  


Birth date and marriage date items were switched while entering data. Which of the following data validation checks could detect this? A. Logical relationship B. Sequence C. Reasonableness D. Validity

1 Answers  


Which of the following is necessary to have FIRST in the development of a business continuity plan? A. Risk-based classification of systems B. Inventory of all assets C. Complete documentation of all disasters D. Availability of hardware and software

1 Answers  


When auditing the requirements phase of a system development project, an IS auditor would: A. assess the adequacy of audit trails. B. identify and determine the criticality of the need. C. verify cost justifications and anticipated benefits. D. ensure that control specifications have been defined.

1 Answers  


Which of the following is an objective of a control self-assessment (CSA) program? A. Concentration on areas of high risk B. Replacement of audit responsibilities C. Completion of control questionnaires D. Collaborative facilitative workshops

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)