For instance, let’s say you are developing an accounting application and you have done the wrong tax calculation. There is a huge possibility that this will lead to the risk of the company running under loss. But if this defect is controlled then we can either remove this risk completely or minimize it.
The following diagram shows how a risk gets converted to a risk and with proper testing how it can be controlled.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / sanjana
Risk is a condition, which cant be eliminated totally, but can be controlled in many scenarios. Testing reduces the occurence of defect which prevents further failure ultimately controlling risk
| Is This Answer Correct ? | 0 Yes | 0 No |
5)which of the following is not the characteristics of well written Bug report? A)It describes a real defect in the product B)It describes the symptoms of the problem in terms of the behaviour of the system C)It contain a step by step procedure for reproducing the problem D)None
Explian traceablity matrix with an example ?
What is the difference between smoke an sanity testing with example ?
i have soure and target having 1 laks records same structure and same data. no primary key. how to do data validation in. how to identify each and every record same r not. i want check every record. wat is process.
How to test gtalk applicatin,what could be the possible test cases,test plan
What do u mean by Top down approach and Bottom up approach? How will u implement these in u r project ?
What is the difference between load testing and volume testing?
Phases of Software Testing Life Cycle?
What is Analyzing the test results / Reports mean ? plz its urgent
4. A software error can be described as: a. A description of the relationship between two or more variables or set members in which the value of one does not influence the values of others. b. Any ill-advised, substandard, or temporary fix applied to an urgent problem in the (often misguided) belief that doing so will keep a project moving forward. c. The process in which developers determine the root cause of a bug and identify possible fixes. d. A mismatch between the program and its specification. 5. Select a reason that does not agree with the fact that complete testing is impossible: a. The domain of possible inputs is too large to test. b. Limited financial resources. c. There are too many possible paths through the program to test. d. The user interface issues (and thus the design issues) are too complex to completely test.
What is Test Strategy in test plan, Please explain in detail ?
what is the metrics followed in a small company( if its not a cmm level company). if there is no business analyst in a company then who will prepare the requirement documents