what is stages in test plan?
Answer / baskar
1.Purpose
2.Scope
3.Objective
4.Feature to be tested
5.Feature not to be tested
6.Schedules and mile stones
7.Resource and their skills
8.Training needs
9.Document to be maintained
10.Risk and mitigation
11.H/w,S/w,requirements
12.Testing deliverables
13.Signoff
14.Annexure and documents for ref
Is This Answer Correct ? | 5 Yes | 0 No |
what is meant by adhoc testing?
What are the different types of integration testing?
1. what are the qualities of a tester ?
Guys, can any one of u give the realtime example for Black Box Testing
could any body tell good ISTQB institute in Hyderabad?
How do you go about testing a project?
Why do we prepare test condition,testcases,testscript?
Hi, I am planing to give ISTQB - Foundation level exam. Can anyone forward the ISTQB materials at laxmi_002@rediffmail.com mail ID.
I am a B.COM graduate. I have studied all the theorotical aspects of manual testing. How can i get in to testing without practical exp. And even if i manage to get a job, i want to know whether i will be able to do my job, being i am new to software field.
What is the difference between stub & Driver? which is needed in Top Up & Bottom Down Testing?
what is the difference between Test strategy and test plan?
25 Answers EDS, IBM,
when tester found bug then where it is assign to developer or testlead