while testing a bug has been found and reported but it was not
fixed and delivered to the client what will be the effect on
it?
Answer / karunakar reddy
Depending up on the priorty of of the bug,
(1) if it is a "High priorty bug" means effecting the
functonality of the applicationn ,then the developers have
to fix it with in no time.
(2) If it is a "Low Priority bug", means not effecting the
application then it has to be fixed in the next iteration
or in no time.
Is This Answer Correct ? | 5 Yes | 0 No |
What are the layers of FCOE Protocol?
Explain storage testing?
Best institute for protocol testing in Hyderabad ? How will be the market for protocol testing ?
repeated testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or unrelated software component:
What is a method that attempts to reduce the complexity levels of aging legacy software? 1. Reengineering 2. Regression 3. Restructuring 4. Reusability 5. Reverse engineering
What the different types of test coverage techniques are?
What all things you should consider before selecting automation tools for the aut?
What's Stress Testing?
Metrics of your Project?
What is an equivalence partition (also known as an equivalence class)?
What are the native operators of Datastage? (ETL Tool)
Is it true that we can do system testing at any stage?