Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A certain street has 1000 buildings. A sign-maker is
contracted to number the houses from 1 to 1000. How many
zeroes will he need?

Answers were Sorted based on User's Feedback



A certain street has 1000 buildings. A sign-maker is contracted to number the houses from 1 to 100..

Answer / guest

Divide 1000 building numbers into groups of 100 each as
follow:
(1..100), (101..200), (201..300), ....... (901..1000)

For the first group, sign-maker will need 11 zeroes.
For group numbers 2 to 9, he will require 20 zeroes each.
And for group number 10, he will require 21 zeroes.

The total numbers of zeroes required are
= 11 + 8*20 + 21
= 11 + 160 + 21
= 192

Is This Answer Correct ?    132 Yes 11 No

A certain street has 1000 buildings. A sign-maker is contracted to number the houses from 1 to 100..

Answer / vijay kumar

192 Zeroes

Is This Answer Correct ?    35 Yes 4 No

A certain street has 1000 buildings. A sign-maker is contracted to number the houses from 1 to 100..

Answer / madhukar

192

Is This Answer Correct ?    19 Yes 1 No

A certain street has 1000 buildings. A sign-maker is contracted to number the houses from 1 to 100..

Answer / yogita jagtap

(1-100)=11 zeroes
(101-200)=20 zeros *8 groups
(901-1000)=21 zeroes
11 + 8*20 + 21
= 11 + 160 + 21 = 192

Is This Answer Correct ?    9 Yes 1 No

A certain street has 1000 buildings. A sign-maker is contracted to number the houses from 1 to 100..

Answer / praveen

10 to 100--->11
////////
101 to 199:
101 tt 110-->10
111 to 200--->12
//////////////////
total 101 to 200--->22
201 to 300--->22
301 to 400--->22
//
900 to 1000-->23

so total no of zeros=11 + 8(22) + 23 =210

Is This Answer Correct ?    2 Yes 28 No

A certain street has 1000 buildings. A sign-maker is contracted to number the houses from 1 to 100..

Answer / jaskaran

201

Is This Answer Correct ?    4 Yes 40 No

Post New Answer

More General Aptitude Interview Questions

Low temperature at the night in a city is more than 1/2 high as higher temperature are 100. Then What is low temperature

2 Answers   Accenture, TCS,


if 30 men completes a job in 15 days working 9 hrs per day..how much hours per day should 40 men work ?? a ) 35 b)7 1/2 c)30 d) none

8 Answers   Accenture,


how do to prepare the sbi exam

0 Answers   State Bank Of India SBI,


MMID full form?

1 Answers   Bank Exams,


Four of the following five are alike in a certain way and so form a group. Which is the one that does not belong to that group? (a) 17 (b) 23 (c) 37 (d) 13 (e) 73

7 Answers  


The mean and the variance of a binomial distribution are 4 and 2 respectively. Then the probability of 2 successes is?

0 Answers   Wipro,


dear sir I need ordance factories non technical model question paper so pls send me the model paper my E-mail Id is sakthisaa@gmail.com

0 Answers  


how to find 4 digit no using the digit 2,2,3,3,3,4,4,4,4

7 Answers  


.Both A and B Alice and Bob play the following chip-off-the-table game. Given a pile of 58 chips, Alice first picks at least one chip but not all the chips. In subsequent turns, a player picks at least one chip but no more than the number picked on the previous turn by the opponent. The player to pick the last chip wins. Which of the following is true?

0 Answers   TCS,


A certain street has 500 buildings. A sign-maker is contracted to number the houses from 1 to 500. How many zeroes will he need?

0 Answers  


Number Series 3,18,4,24,5,30,?

6 Answers   TCS,


What are the major data structures used in the following areas : RDBMS, Network data model & Hierarchical data model.

2 Answers  


Categories