The Following Characterstics posses some XYZ company.
* Uses formal standards and policies
* Conducts software inspections
* Has advanced configuration management and change control
* Uses CASE tools
* Has a software engineering process group
* Gathers metrics on process and quality
* Requires that developers have formal software engineering
training
* Practices continued process improvement
Based on aboue , Tell me which CMM Level is the company..?
1. Level 1 - Initial
2. Level 2 - Repeatable
3. Level 3 - Defined
4. Level 4 - Managed
5. Level 5 - Optimizing
No Answer is Posted For this Question
Be the First to Post Answer
What is Gap Analysis
you are a SQA lead on a project that uses an agile development environment, The lead developer has been instructed to write and initially-failing automated test case, then produce minimum amount of code to pass the test and finally refactor the new code to acceptable standards. based on above, Which type of SQA-focused SDLA is being used?
What is black box testing? What are the different black box testing techniques?
What is a test closure?
What is the difference between uat (user acceptance testing) and system testing?
What are the categories of defects?
Raju has two candles with same size ,differ in thickness, one burns 6 hours and other is 4 hours, before going to bed, raju has observed that one candle is double than other. After how many hours he has seen that?
What is branch coverage?
Evaluation?
What is a GAP analysis?
Explain compatibility testing?
What is utilization?