what is Difference between entry criteria and exit
criteria ?
Answers were Sorted based on User's Feedback
Answer / murthyvsn
Entry criteria should be fulfilled before system testing
begins
1.All the developed code must be unit tested.
2.All the s/w tools must be installed successfully and
functioning properly.
3.A separate QA environment must be available.
4.All the documents must be signedoff by business analyst.
Exit Criteria
1.Application must be having required resources.
2.All priority1 and priority2 bugs must be fixed
successfully.
3.Regression testing must be completed.
| Is This Answer Correct ? | 11 Yes | 0 No |
Entry and exit criteria is nothing but when to start
testing and when to stop testing.
Entry criteria:
All source codes are unit tested
All QA resource has enought functional knowledge
H/W and s/w are in place
Test plans and test cases are reviewed and signed off
Exit criteria:
Ensuring sufficient coverage of code
Ensuring sufficient coverage of functionality
Testing all of the high risk areas
The reliability of the product
The amount and severity of acceptable faults
The testing completeness deadline
| Is This Answer Correct ? | 10 Yes | 1 No |
Answer / palguna.akuleti
Entry criteria to one phase will become exit criteria to
other phase.
For suppose
Entry criteria :requirements for Design phase.
will come from First phase i.e information gathering phase.
Exit criteria :The out come from Design phase becomes Exit
criteria and becomes entry criteria for Coding phase.
if it is wrong please correct me.
| Is This Answer Correct ? | 11 Yes | 3 No |
Answer / hari
Entry criteria is nothingbut what to be needed for the
present testing and Exit criteria nothingbut what is the
ending of that testting
for example in system testing Entry criteria is
successfully compleetion of integration testing
Exit criteria are
Sign off system testing
one another example
for the Regression testing
Entry criteria : Testing of change requirements are signed
off
Exitcriteria: All regression test cases are executed
status Report document
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / murali
entry crteria means start the testing
exit criteria means stop the applicetion
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / bhasklar
Entry criteria is represent the entry testing,
exit criteria is represent the stop testing
| Is This Answer Correct ? | 0 Yes | 2 No |
If there is no sufficent time for testing & u have to complete the testing then what will u do?
what is a use case ?.
what is cvs in testing
Hi,please help me out with my ques:when a bug araises how will we send the bug report to developer in which way?if through mail means how which way?first to who we need to send the report?
What is web architecture that is followed while doing online project and tell the samples of architecture?
Hi,Please can any one tell me about SAP Testing concepts.
How to do test if we have minimal or no documentation about the product?
what is an inconsistent bug?
A 2 different developer design same function. After both completed. In testing engineer how do test that function?
Notepad(Editor),we test is which type of testing? a)Functionality Testing,b)Compatability Testing,c) All,d) None
Difference between Test scenario and test cases?
what is pareto analysis?