How will you decide defect severity and priority?
Answer / mudaseer
if the app crashes then it is high priority & high severity
| Is This Answer Correct ? | 0 Yes | 0 No |
"U2" has a concert that starts in 17 minutes and they must all cross a bridge to get there. All four men begin on the same side of the bridge. You must help them across to the other side. It is night. There is one flashlight. A maximum of two people can cross at one time. Any party who crosses, either 1 or 2 people, must have the flashlight with them. The flashlight must be walked back and forth, it cannot be thrown, etc. Each band member walks at a different speed. A pair must walk together at the rate of the slower man's pace: Bono: 1 minute to cross Edge: 2 minutes to cross Adam: 5 minutes to cross Larry: 10 minutes to cross For example: If Bono and Larry walk across first, 10 minutes have elapsed when they get to the other side of the bridge. If Larry then returns with the flashlight, a total of 20 minutes have passed and you have failed the mission. Notes: There is no trick behind this. It is the simple movement of resources in the appropriate order.
you are a SQA lead on a project that uses an agile development environment, The lead developer has been instructed to write and initially-failing automated test case, then produce minimum amount of code to pass the test and finally refactor the new code to acceptable standards. based on above, Which type of SQA-focused SDLA is being used?
How to answer when the interviewer asked "what is your project architecture?" pls. tell me in general ..
What is the negative and positive testing?
What is branch coverage?
What is syntax?
Why are static testing and dynamic testing described as complementary?
What are the check points we need to consider while performing Database migration (ex: from oracle 8i to 9i)
What are non-functional requirements?
What is the mission of testing?
Spot the 5 differences between the two figures
what is the most challenging situvation r u phased while during testing?