Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


If a interviewer ask me the duration of my project, then
should i tell them the total(development+testing) time of
the project? Plz tell it's urgent

Answers were Sorted based on User's Feedback



If a interviewer ask me the duration of my project, then should i tell them the total(development+t..

Answer / reddy

No Actually nowadays every org.following V-Model so,we start
Devt n testing at same time we give ultimatly Dev+Testing.

Is This Answer Correct ?    1 Yes 0 No

If a interviewer ask me the duration of my project, then should i tell them the total(development+t..

Answer / evelyn

Duration of a project will include both development and
testing time.B'coz at the time of development, tester will
not be passive. tester will be preparing test plans and
also some works will be planned to do the testing in more
efficient manner.

Is This Answer Correct ?    1 Yes 0 No

If a interviewer ask me the duration of my project, then should i tell them the total(development+t..

Answer / narayana ch.

hi this narayana...
The project time means the total time taken for developing
as well as the taken for testing the project....

Is This Answer Correct ?    0 Yes 0 No

If a interviewer ask me the duration of my project, then should i tell them the total(development+t..

Answer / swapnil

hi this swapnil
no, as per u are a tester u only given a testing time 2
management not a developing n what a funtionality of
database u tell them a duration of ur testing skill.
is there any douts plz send me mail on mail id..
thankuuuuuuuuuuuuuuuuuuuuuu

Is This Answer Correct ?    0 Yes 0 No

If a interviewer ask me the duration of my project, then should i tell them the total(development+t..

Answer / narayana ch.

thank's for correcting me.....

Is This Answer Correct ?    0 Yes 0 No

If a interviewer ask me the duration of my project, then should i tell them the total(development+t..

Answer / deepika

Hey guys tell what i should write in my resume as total
project duration(development+testing)or only testing
duration.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

what are the different statuses of test cases?

11 Answers  


1.what is the deference between priority and severity?

9 Answers  


what is Ping tests?

1 Answers   Crea,


What is the test case, test scenario, test suit and explain differences bewteen the above ones

9 Answers   Kclink Technologies, Oracle,


how we do system testingf project?

3 Answers   InfoStep,


can anybody tell me what is thread testing with a practical example,coz the defn is liitle complex it seems.

3 Answers  


What is the type of testing that you apply for maintenance phase in V-Model

1 Answers   CFC,


What is White Box testing and who is responsible for white box testing?

11 Answers   TCS,


Fault-based testing is best reserved for Option 1 Conventional software testing Option 2 Operations and classes that are critical or suspect Option 3 Use-case validation Option 4 White-box testing of operator algorithms

1 Answers   IonIdea,


Data flow testing is a control structure testing technique where the criteria used to design test cases is that they Option 1 Rely on basis path testing Option 2 Exercise the logical conditions in a program module Option 3 Select test paths based on the locations and uses of variables Option 4 Focus on testing the validity of loop constructs

1 Answers  


what is 4 p's? Exact difference between testing and QA

7 Answers   Patni,


What is the Waterfall Development Method and do you agree with all the steps?