how do we update the test cases if the requirements change
in manual testing. if we r not using quality center.
depending on the changed requirements do i need to write a
new test case or can we update the old test case.basically
i want to update i dont want to write a new test case. so
plzzzzzz answer.

Answers were Sorted based on User's Feedback



how do we update the test cases if the requirements change in manual testing. if we r not using qu..

Answer / praveen barthwal

Hi Deepa and Ns Rao

NsRao I think Deepa is right, it doesn't matter whether u
are righting your test case (Excel or test director),
creating a tracibility matrics is part of the testing
process.

Only from the tracibiltity matrics you can identify that
your test coverage is completed or not , you can also make
the link between the Xls test case with requirement ID in
xls file too.

Praveen Barthwal
Project Lead (Software QC)

Is This Answer Correct ?    4 Yes 0 No

how do we update the test cases if the requirements change in manual testing. if we r not using qu..

Answer / deepa

When there is changes in the req ..we need to first find
out the affected testcase and need to edit/block the
testcase..the very first time when we write the testcase a
traceability matrix will be prepared..Traceability matrix
is nothing but testcases mapped with the reqs..Req id needs
to be mapped with test case id..When there is change in the
req we need to look for the req id and change
corresponding test case id...

Is This Answer Correct ?    3 Yes 0 No

how do we update the test cases if the requirements change in manual testing. if we r not using qu..

Answer / laxmi

If the requirement is compleately changed definitely we
have to write new test cases
if the requirement is not compleately changed we can update
the old one that depends on the effect on functionality

Is This Answer Correct ?    1 Yes 0 No

how do we update the test cases if the requirements change in manual testing. if we r not using qu..

Answer / nsrao

hi deepa

i dont know whether i am right or wrong. but to my
knowledge we use traceability matrix when we r working with
test director. but here i am not using test director, i am
writing my test cases in excel.

Is This Answer Correct ?    0 Yes 0 No

how do we update the test cases if the requirements change in manual testing. if we r not using qu..

Answer / nsrao

thanks praveen

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

what is check list?why it is prepared?

0 Answers   Wipro,


Tell me about the best bug you ever found.

1 Answers   C1 India,


If the developer rejects that its not abug means then whats the next step we follow?

8 Answers  


What do u mean by Positive and Negative testing & whatz r the diff's between them .Can anyone explain with an example .

4 Answers   AZTEC,


what is localization and globalization.and what are the ways way are going to test the particular application?how can we identify factual, visual, corrupted characters, link errors, formatting errors, etc in locallization?iam going to attend the interview on localization concepts and languages like : German, Japanese, French, Russian, Italian, Chinese, Korean, Portuguese and Spanish .tell me the process how to do testing above concepts let me know its urgent:anilaluvala@gmail.com 9908814046

0 Answers  






wht is RTM(Requirememts Tracebility Matrix), what are the contents includes in this spreadsheet.. Anybody can answer this question...

3 Answers  


Testing Engineer having Software Programming knowledge so Which type of testing will be done. 1.Adhoc testing 2.random testing 3. functional testing 4. monkey testing

4 Answers  


Can you tell me what is negative testing?

4 Answers  


Write the possible positive and negative testcases for telephone.

3 Answers   IonIdea,


What is bug leakage?

0 Answers  


What testing procedure you follow? how

0 Answers   RBS,


what is the Exact difference between Sanity and Smoke testings

5 Answers  


Categories