Can the system testing be done at any stage?..

Answer / balakumaran.l.s

No the system Testing can be performed only after the
Integration Testing.



Correct Me If iam wrong.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

How to do test if we have minimal or no documentation about the product?

5 Answers  


What is the Major difference between Sanity and Smoke Testing

7 Answers  


explain me traceability matrix in brief....?

2 Answers  


Loop Testing Comes Under 1. White box Testing 2. Block Box Testing 3. Green Box Testing 4. Yellow Box Testing

3 Answers  


Hi can any one plz answer me how to set up the test environment does it done by tester it self? its urgent thanks in advance roli

3 Answers   Cap Gemini,






What is bug leakage?

0 Answers  


what is the difference between the severity and priority and tell me high severity and low priority ,low severity and high priority ,high severity and high priority ,low severity and low priority

3 Answers   L&T, Polaris,


What is Exit Criteria and what should be covered in it?

2 Answers   Power Designs, Zensar,


give 1 example of an error with high severity and low priority?

4 Answers   Omnitech,


Explain the importance of agile testing?

0 Answers  


how do u perform monkey testing on website? plz dont give definitions? plz tell me some abnormal actions on website?

9 Answers   Accenture,


1.what are disadvantage of V model? 2. In V model two phase is there. That is verification and validation.1St phase is verification , why it is called verification?

2 Answers  