When a bug status will be changed to "DEFERRED" , by the
developer ? What might b the situations to change the status
to deferred ? pls explain with an example .
Answers were Sorted based on User's Feedback
Answer / divya rana
When a bug is not of high "priority" and its not going to
cause any serious failure as such on customer's side i.e
its of low "severity" also,then the developer can change
the bug status to "deferred".
For eg.While coding the GUI part of the
application ,developer has provided menus to navigate to
other pages but he forgot to provide"NEXT" button on home
page which is a part of the requirement,then he can defer
it for later modification.
| Is This Answer Correct ? | 7 Yes | 11 No |
Answer / sabir
If the defect is determined to be an enhancement, the
development team will set the status to Deferred.
| Is This Answer Correct ? | 0 Yes | 4 No |
if we ve 1000 test cases to run and we ve no time and we dnt wanna use automation tool how we will complete testing in time constrant plz do answer
How Could u Present Test Strategy for the Product Testing?
winrunner q's..(if winrunner 1.explain types of recording modes? 2.how winrunner recognize GUI objects? 3.what is there in GUI map editor? 4.explain types of checkpoints? 5.syncronization point? 6.diff. between wait st. and synchornization? 7.diff.between is treturn & texit? 8.diff between tl_step and report_msg? 9.what is data driven test? 10how we parameterize the variable? 11.some ddt commands? 12.why we need to automate ? 13.explain database checkpoints with connectivity? 14.diff..between compiler module and main script? 15.expain in,out,inout parameters? 16.function generator? 17. Search path,breakpoints? 18.diff between step,step in,step out?
what is performance testing?
is functional and black box testing same or not
Can list out some disadvantages of manual testing?
Please give an example of White box Testing?
What all possible test scenarios can be written for the PAINT OF An Airplane?
Please can any one tell me 1).Types of reports 2).Types of Meetings.
What is bug life cycle?Explane with example
Is the build or version number change during retesting
can any one give the definitions for the High Level Design and the Low Level Desigh in the Designing part of SDLC????