A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More General Aptitude Interview Questions

Number Series 8,9,11,14,,18,23,?

11 Answers   TCS,


24. 13 kigs and 6 libs can produce 510 tors in 10 hrs, 8 kigs and 14 libs can produce 484 tors in 12 hrs.Find the rate of production of tors for kigs and libs. Express the answer in tors/hr.

3 Answers   Caritor, Infosys, Secon,


If y/x = 1/3 and x + 2y = 10, then x is

15 Answers  


5. if atlantic is found in atlantic ocean, india is found in indian ocean then which of the following cases are true

1 Answers   TCS,


Grass in lawn grows equally thick and in a uniform rate. It takes 24 days for 70 cows and 60 days for 30 cows to eat the whole of the grass. How many cows are needed to eat the grass in 96 days?

3 Answers   Anna University, CTS, Infosys,






A man leaves office daily at 7:00 pm. A driver with car comes from his home to pick him from office and bring back home. One day he gets free at 5:30 and instead of waiting for driver he starts walking towards home.In the way he meets the car and return home on car. He reaches home 20 min earlier than usual.in how much time does the man reach home usually... ? GIVE THE STEPS PLZ...

3 Answers   Lehman Brothers, Oracle, Wipro,


300 + (10)2 x 2 = ? (a) 450 (b) 800 (c) 500 (d) 550 (e) None of these

8 Answers   Michelin,


If 20 men take 15 days to to complete a job, in how many days can 25 men finish that work?

0 Answers   Accenture,


Find the physical quantity represented by MOMENTUM * VELOCITY] / [LENGTH * ACCELERATION]?

0 Answers   Accenture,


A and B can do a piece of work in 72 days; B and C can do it in 120 days; A dn C can do it in 4 days. Who among these will take the least time if put to do it alone?

7 Answers   Loco Pilot, Wipro,


I kindly request you to send me the question paper for sbi management executive test. Send me to this mail id . smhumayun_86@yahoo.com

0 Answers  


Argentina had football team of 22 player of which captain is from Brazilian team and goalki from European team. For remainig palayer they have picked 6 from argentinan and 14 from european. Now for a team of 11 they must have goalki and captain so out of 9 now they plan to select 3 from rgentinian and 6 from European. Find out no. of methods avilable for it.

2 Answers   CTS,


Categories