A chain is broken into three pieces of equal lengths containing 3 links each. It is taken to a blacksmith to join into a single continuous one. How many links are to to be opened to make it ?
No Answer is Posted For this Question
Be the First to Post Answer
If second no is twice the first no and first no is thrice the third no.Their avg is 20.Find the greatest no?
12 Answers Accenture, HCL, Satyam, TCS,
if today is monday after 61 days it will be?
(root 200) - (root 50) =?
4 Answers Citicorp, COSL, Wipro,
hi, i have filled up the EPFO exam form i m bsc chemsitry graduate so can any1 guide me wat all questions will be asked in office work aptitue??? so thati can do my preparation in exam???
What is bull and bear market
window was introduse in
The minimum token cost is Rs. 100, which grants the token holder to travel up to a distance of 10 miles. And for every additional mile travelled, the charge is Rs. 10. A minimum luggage weight of 10 kg is not charged, after which it is charged at Rs. 1 per kg. During a specific journey, suppose you carry a weight of 'k' kg, and a distance of 'p' miles is travelled, which equation will indicate the correct total charge to be paid by the traveller?
The cost of four dozen proof machine ribbons and five dozen accounting machine ribbons was Rs.160/-. If one dozen accounting machine ribbons cost Rs.20/-, what is the cost of a dozen proof machine ribbons?
Can you Please help me to get question papaer of Hp company for BPO non voice for fresher Where engish, mathematics , reasoning every thing will be there. I am goin to apply on 25 feb 2008 so need this urgently so that i can prepare for the written test.
The price of Machine D equals the sum of the prices of machine A, B and C whose price are in the ratio 2:3:4 respectively. If weights of A, B, C and D varies as square of its individual price and difference of weight of D and A, B and C together is 9880 kg. Then what is the weight of D?
please send me previous 10 years of question papers of grameena bank officers post exam
A lorry starts from Bangalore to Mysore at 6.00 A.M,7.00am.8.00 am.....10 pm. Similarly one another starts from Mysore to Bangalore at 6.00 am,7.00 am, 8.00 am.....10.00pm. A lorry takes 9 hours to travel from Bangalore to Mysore and vice versa. A lorry which had started at 6.00pm will cross how many lorries.