2 persons can finish a job in 8 days. First person alone can finish the work in 24 days. How many days does the second person take to finish the job?
No Answer is Posted For this Question
Be the First to Post Answer
MMID full form?
There are two trees in a lawn. One grows at a rate 3/5 of the other in 4 years. If the total growth of trees is 8 ft. What is the height of the smaller tree after 2 years
there are two categories of persons in ratio a:b = 2:3. A type earns 2.5 dollars/hr and b type 1 dollar/hr total money earned by both is 24dollars. Then what is the total number of persons
Venkat has 1boy&2daughters.The product of these children age is 72.The sum of their ages give the door numberof Venkat.Boy is elder of three.Can you tell the ages of all the three.
at what rate of interest would compound interest on a sum in two years be 20% more than the corresponding simple interest?
what is difference between abstract class and interface?
Suhana gets 70% in Maths, 80% in Physics. To get an overall of 75% how much should she get in English.
Fresh Grapes contain 90% water by wt. Dried grapes contain 20% water by %age. What will b wt of dried grapes when we begin with 20 kg fresh grapes
8 man work for 6 days to complete a work. How many men are required to complete same work in 1/2 day.
5 Answers Citicorp, COSL, Wipro,
Consider the sequence of numbers a1, a2, a3, ..... to infinity where a1 = 81.33 and a2 = -19 and aj = aj-1 -aj-2 for j ≥ 3. What is the sum of the first 6002 terms of this sequence?
can any1 inform me abt office work aptitude?????????
If a train covers 600m in 0.5 seconds, how long it will cover in 10 seconds?
0 Answers BPCL Bharat Petroleum, Sonata,