Means of interrupt in cpu operations?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Architecture Design AllOther Interview Questions

how much steel bar required for 1 sqm area

0 Answers  


What is the name of the first type of building used in Christian Churches?

0 Answers   RRB,


why you want to become artictecture

0 Answers   JP Group,


Is DataStage Designer, a thin client or a thick client?

0 Answers  


If igloos and golf balls have any relation to the structure of domes, if so which were made first? and when were they supposedly invented?

1 Answers  






1. What are the three services offered by GSM? Explain each of them briefly.

1 Answers   Nokia,


How to plot diagram drawn in Autocad

2 Answers  


Iam studying architecture in India. I have an interest in vernacular arcjitecture. I want to specialize in that, so what are the ways for that, after graduation?

1 Answers  


RCC colums of 15"X9" each, roof height 20.5'ft, total pillars 36 nons. Span between pillar to pillar is 16/20/20 length wise and 16/14 width wise. Total Slab area 8000 sft and plinth area is 1900 sft. beams are 12"X9". kindly calculate load factor per sqft.

1 Answers   ITI,


describe an achievement highlighting your approach to a problem you faced as well as the solution you developed

0 Answers  


Why did you choose Architecture as your major?

0 Answers  


Which of the following sentence is not correct

2 Answers   NATA,


Categories
  • Interior Design Interview Questions Interior Design (21)
  • Architecture Design AllOther Interview Questions Architecture Design AllOther (185)