any deviation can be changed into the change control?
Answers were Sorted based on User's Feedback
Answer / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
| Is This Answer Correct ? | 42 Yes | 4 No |
Answer / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
| Is This Answer Correct ? | 25 Yes | 3 No |
Answer / mohinder singh
concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control
| Is This Answer Correct ? | 20 Yes | 0 No |
Answer / deepthi
Yes few deviations can be changedto changecontrol.
| Is This Answer Correct ? | 10 Yes | 2 No |
What is the difference between Analytical method validation and Analytical method transfer?
hi can anyone send me the model papers for drug inspector post,im frm ap....i completed my bpharm this year..pls help me,if u do i wl be very thankful to u...my email id- slpriyanka.r@gmail.com
How polarimeter is calibrated?
What is the calibration of HPLC?
What is 21 CFR? And its significance.?
What is the wave length of polarimeter lamp?
Can any deviation be changed into the change control?
When we change water of Hygrometer?
What should be Step wise the sterlization procedure for Dry Powder injection facility (from Starting)?
0 Answers Nectar Lifesciences,
i am preparing for Drug inspector exam.If u have previous questions please send me.
What should be the sampling point in dissolution test?
What is capacity factor?