any deviation can be changed into the change control?
Answers were Sorted based on User's Feedback
Answer / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
| Is This Answer Correct ? | 42 Yes | 4 No |
Answer / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
| Is This Answer Correct ? | 25 Yes | 3 No |
Answer / mohinder singh
concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control
| Is This Answer Correct ? | 20 Yes | 0 No |
Answer / deepthi
Yes few deviations can be changedto changecontrol.
| Is This Answer Correct ? | 10 Yes | 2 No |
if one drug is acidic in nature and the other drug is basic in nature, e.g. desloratadine is soluble in acidic environment i.e 0.1N HCL whereas Montelukast Sodium is soluble in basic environment i.e. .2% SLS. How can we choose a common media for there Dissolution?
How do you balance the benefits and risks of Alprazolam treatment when considering its prescription for an elderly patient with multiple comorbidities?
What is medical representative role ?
how to calculate the potency of gentamycin sulfate
Habson Jobsup Consultants, placement company New Delhi
when will andhra pradesh government announce examination date for drug ispector post?
Why and When RRF is necessary in RS method? How it is helpful in method development?
0 Answers Hetero, Panacea, Raks Pharma,
What is difference between assay and content uniformity ?
how quantitative stability studies are done?
If calibration of 12 bowl dissolution apparatus does not meets single stage procedure, how can you precede calibration?
how the qualification of pharma can help in banking
0 Answers Banking, Reddy Labs,
what is photo stability