any deviation can be changed into the change control?
Answers were Sorted based on User's Feedback
Answer / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
Is This Answer Correct ? | 42 Yes | 4 No |
Answer / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
Is This Answer Correct ? | 25 Yes | 3 No |
Answer / mohinder singh
concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control
Is This Answer Correct ? | 20 Yes | 0 No |
Answer / deepthi
Yes few deviations can be changedto changecontrol.
Is This Answer Correct ? | 10 Yes | 2 No |
what is Alcova
What is the wavelenght of sodium D-line in Polarimeter?
what is the differece between polarimeter lamp and IR lamp ?
Can you explain the pharmacological mechanism of Alprazolam and how it interacts with the central nervous system?
what is prodrug and what is softdrug ?
How would you propose to advertise your drug?
What is the Disintegration time for Hard gelatin Capsule in USP?
Can we quantify bound water by KF titrator ?
What are the two drugs available for treating AIDS?
when will andhara pradesh government announces drug inspector posts and when will be the exam conducted? please inform me..
DEFINITION OF STABILITY INDICATING METHOD
What do you mean by Q+5 in dissolution?