any deviation can be changed into the change control?
Answer Posted / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
| Is This Answer Correct ? | 42 Yes | 4 No |
Post New Answer View All Answers
at what interval Ukrainian audit will come once you register your product??
How to measure each & every tablets hardness in compaction force control system of compression machine?
why we study matrixing in stability system in stability study and on what basis we select time point.
hi i have done my b pharma and now i am working as a managing director in my own manufacturing unit is there any scope overthere 4 me
What is the difference between temporary change control and deviation?
What is the calibration of HPLC?
What should be Step wise the sterlization procedure for Dry Powder injection facility (from Starting)?
when we calibrate uv for control of wavelength we scan for 200 to 800 nm but we get the result only for some specific wavelength how we confirm for all other wavelength?
what is antioxidant para meters
Can you please mail me the latest syllabus of UTTAR PRADESH DRUG INSPECTOR entrance exam and UTTAR PRADESH FOOD INSPECTOR entrance exam with the eligibility criteria for Uttar Pradesh domicile candidates.
Alprazolam has the potential for misuse and addiction. How would you approach prescribing Alprazolam to a patient with a history of substance abuse?
How we fix the validity period of a volumetric solution and re-standardization due date?
Delay in receiving offer letter? Dear All, Recently I clear all technical and HR round with one good MNC. I've submitted my scan document of qualification and work experience. Evenafter 2 weeks of sending documents, they didn't release the offer letter. Please suggest me effective email contents to deal them. Thank You
What is the difference of vacuum pressure and vapor pressure?
how related substnce method developted for new compound which not official in the pharmacopiea