any deviation can be changed into the change control?

Answer Posted / mohinder singh

concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control

Is This Answer Correct ?    20 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is main of k*abs in uv visible spectroscopy

1679


What are the limits for LOD and LOQ?

1753


whem will be the exam or interview for the post of Drug inspector is conducted in jammu and kashmir??? the form was filled on starting of 2013.

1969


In dissolution test why sample is withdrawn from top of the paddle and not less than 1 cm away from wall?

1972


What is the difference between polarimeter lamp and IR lamp?

5145






principle of dissolution

2931


what is difference between usfda and mhra guidline

2182


hello friends... i got 3 tym rejection in my us student visa interview. every tym vo ask me same questions lyk y ths uni, y ths course n abt my sponsor etc. pls gv me suggestion for th que, y ths uni? as my undergraduate major is pharmacy n i got i 20 frm university of bridgeport for ms in biomedical eng.

1667


In Stability testing if significant change occurs then what will be the action plan?

3009


How would you propose to advertise your drug?

657


Describe some major trends in pharmaceutical field?

636


What is limit of cleaning validation?

1853


please tell me croscarmellose sodium usp Water-soluble substances calculation and give me exmpl

2768


How can you fix the known and unknown impurity limit for any drug substance?

2165


what is antioxidant para meters

2349