I'm in search of a test management system that can handle the
tasks for instance of a manager or a tester equally well Can
anyone help you in this?
Answer / john
I think the test management system Zephyr 3.0(http://www.getzephyr.com) would be ideal for you as it is role based with different applications for different roles.
| Is This Answer Correct ? | 0 Yes | 0 No |
hey, i recently attended 2 interviews and they asked whether I used qamonitor of softsmith. any help on what it does?
what is Response Time?
What is equivalence class?
In practice, which life cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and system integration testing after system testing.
HOW DO YOU COMMUNICATE WITH THE DEVELOPER ON DEFECT?
What is flowchart?
What is CCB and MTBF, why should we use this.
What is loop testing?
Spot the 5 differences between the two figures
I faced this question in the interview "What is the reason for leaving the previous job?" I answered "Career Growth as well as financial growth" Is this a right answer?
I. Requirements are formally reviewed. II. Requirements are formally approved. III. Requirements are placed under configuration control. IV. Requirements are implemented in code. Using the above statements, when are requirements considered baselined? 1. I and II 2. I, II, and III 3. I, II, III, and IV 4. I only 5. I, III, and IV
When should 'regression testing' be performed?