Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When auditing a mainframe operating system, what would the
IS auditor do to establish which control features are in
operation?

A. Examine the parameters used when the system was generated

B. Discuss system parameter options with the vendor

C. Evaluate the systems documentation and installation guide

D. Consult the systems programmers



When auditing a mainframe operating system, what would the IS auditor do to establish which control..

Answer / guest

Answer: A

The only way to establish which controls are functioning in
a current operating system is to determine what the
parameter settings were at the time the system was generated
or created (often referred to as the initial program load or
IPL). Although the findings of this exercise may well be
further evaluated by discussion with the vendor, evaluating
the documentation and consulting the systems programmers,
these actions would not, by themselves, establish specific
control features.

Is This Answer Correct ?    6 Yes 1 No

Post New Answer

More CISA Certification Interview Questions

A data administrator is responsible for: A. maintaining database system software. B. defining data elements, data names and their relationship. C. developing physical database structures. D. developing data dictionary system software.

3 Answers  


The review of router access control lists should be conducted during a/an: A. environmental review. B. network security review. C. business continuity review. D. data integrity review.

1 Answers  


Which of the following IT governance best practices improves strategic alignment? A. Supplier and partner risks are managed. B. A knowledge base on customers, products, markets and processes is in place C. A structure is provided that facilitates the creation and sharing of business information. D. Top management mediate between the imperatives of business and technology

2 Answers  


Which of the following is a telecommunication device that translates data from digital form to analog form and back to digital? A. Multiplexer B. Modem C. Protocol converter D. Concentrator

2 Answers  


Which of the following techniques or tools would assist an IS auditor when performing a statistical sampling of financial transactions maintained in a financial management information system? A. Spreadsheets B. Parallel simulation C. Generalized audit software D. Regression testing

1 Answers  


The BEST time to perform a control self-assessment involving line management, line staff and the audit department is at the time of: A. compliance testing. B. the preliminary survey. C. substantive testing. D. the preparation of the audit report.

1 Answers  


Following the development of an application system, it is determined that several design objectives have not been achieved. This is MOST likely to have been caused by: A. insufficient user involvement. B. early dismissal of the project manager. C. inadequate quality assurance (QA) tools. D. noncompliance with defined approval points.

1 Answers  


Which of the following is the initial step in creating a firewall policy? A. A cost-benefits analysis of methods for securing the applications B. Identification of network applications to be externally accessed C. Identification of vulnerabilities associated with network applications to be externally accessed D. Creation of an applications traffic matrix showing protection methods

1 Answers  


Disaster recovery planning for a company's computer system usually focuses on: A. operations turnover procedures. B. strategic long-range planning. C. the probability that a disaster will occur. D. alternative procedures to process transactions.

1 Answers  


Which of the following groups should assume ownership of a systems development project and the resulting system? A. User management B. Senior management C. Project steering committee D. Systems development management

3 Answers  


A strength of an implemented quality system based on ISO 9001 is that it: A. guarantees quality solutions to business problems. B. results in improved software life cycle activities. C. provides clear answers to questions concerning cost-effectiveness. D. does not depend on the maturity of the implemented quality system.

2 Answers  


Of the following, the MAIN purpose for periodically testing offsite backup facilities is to: A. ensure the integrity of the data in the database. B. eliminate the need to develop detailed contingency plans. C. ensure the continued compatibility of the contingency facilities. D. ensure that program and system documentation remains current.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)