When two or more systems are integrated, input/output
controls must be reviewed by the IS auditor in the:

A. systems receiving the output of other systems.

B. systems sending output to other systems.

C. systems sending and receiving data.

D. interfaces between the two systems.



When two or more systems are integrated, input/output controls must be reviewed by the IS auditor i..

Answer / guest

Answer: C

Both of the systems must be reviewed for input/output
controls since the output for one system is the input for
the other.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

In a LAN environment, which of the following minimizes the risk of data corruption during transmission? A. Using end-to-end encryption for data communication B. Using separate conduits for electrical and data cables C. Using check sums for checking the corruption of data D. Connecting the terminals using a star topology

1 Answers  


Which of the following is a dynamic analysis tool for the purpose of testing software modules? A. Blackbox test B. Desk checking C. Structured walk-through D. Design and code

1 Answers  


A disaster recovery plan (DRP) for an organization should: A. reduce the length of the recovery time and the cost of recovery. B. increase the length of the recovery time and the cost of recovery. C. reduce the duration of the recovery time and increase the cost of recovery. D. not affect the recovery time nor the cost of recovery.

1 Answers  


When implementing continuous monitoring systems an IS auditor's first step is to identify: A. reasonable target thresholds. B. high-risk areas within the organization. C. the location and format of output files. D. applications that provide the highest potential payback.

1 Answers  


Which of the following is an objective of a control self-assessment (CSA) program? A. Concentration on areas of high risk B. Replacement of audit responsibilities C. Completion of control questionnaires D. Collaborative facilitative workshops

1 Answers  






Which of the following can be used to verify output results and control totals by matching them against the input data and control totals? A. Batch header forms B. Batch balancing C. Data conversion error corrections D. Access controls over print spools

1 Answers  


The purpose of debugging programs is to: A. generate random data that can be used to test programs before implementing them. B. protect, during the programming phase, valid changes from being overwritten by other changes. C. define the program development and maintenance costs to be include in the feasibility study. D. ensure that program abnormal terminations and program coding flaws are detected and corrected.

2 Answers   KPMG,


An independent software program that connects two otherwise separate applications sharing computing resources across heterogeneous technologies is known as: A. middleware. B. firmware. C. application software. D. embedded systems.

1 Answers  


A distinction that can be made between compliance testing and substantive testing is that compliance testing tests: A. details, while substantive testing tests procedures. B. controls, while substantive testing tests details. C. plans, while substantive testing tests procedures. D. for regulatory requirements, while substantive testing tests validations.

3 Answers  


Which of the following BEST describes the necessary documentation for an enterprise product reengineering (EPR) software installation? A. Specific developments only B. Business requirements only C. All phases of the installation must be documented D. No need to develop a customer specific documentation

2 Answers  


Which of the following would an IS auditor consider a weakness when performing an audit of an organization that uses a public key infrastructure (PKI) with digital certificates for its business-to-consumer transactions via the Internet? A. Customers are widely dispersed geographically, but the certificate authorities (CAs) are not. B. Customers can make their transactions from any computer or mobile device. C. The CA has several data processing subcenters to administer certificates. D. The organization is the owner of the CA.

1 Answers  


Which of the following offsite information processing facility conditions would cause an IS auditor the GREATEST concern? The facility A. is identified clearly on the outside with the company name. B. is located more than an hour driving distance from the originating site. C. does not have any windows to let in natural sunlight. D. entrance is located in the back of the building rather than the front.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)