Which of the following types of controls is designed to
provide the ability to verify data and record values through
the stages of application processing?
A. Range checks
B. Run-to-run totals
C. Limit checks on calculated amounts
D. Exception reports
Answer / guest
Answer: B
Run-to-run totals provide the ability to verify data values
through the stages of application processing. Run-to-run
total verification ensures that data read into the computer
was accepted and then applied to the updating process.
| Is This Answer Correct ? | 6 Yes | 0 No |
When two or more systems are integrated, input/output controls must be reviewed by the IS auditor in the: A. systems receiving the output of other systems. B. systems sending output to other systems. C. systems sending and receiving data. D. interfaces between the two systems.
Which of the following procedures would BEST determine whether adequate recovery/restart procedures exist? A. Reviewing program code B. Reviewing operations documentation C. Turning off the UPS, then the power D. Reviewing program documentation
Which of the following would be the LEAST important aspect of a business continuity plan? A. Redundant facilities B. Relocation procedures C. Adequate insurance coverage D. Current and available business continuity manual
The potential for unauthorized system access by way of terminals or workstations within an organization's facility is increased when: A. connecting points are available in the facility to connect laptops to the network. B. users take precautions to keep their passwords confidential. C. terminals with password protection are located in unsecured locations. D. terminals are located within the facility in small clusters under the supervision of an administrator.
In an audit of a business continuity plan, which of the following findings is of MOST concern? A. There is no insurance for the addition of assets during the year. B. BCP manual is not updated on a regular basis. C. Testing of the backup of data has not been done regularly. D. Records for maintenance of access system have not been maintained.
In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.
Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review
A company has contracted with an external consulting firm to implement a commercial financial system to replace its existing in-house developed system. In reviewing the proposed development approach, which of the following would be of GREATEST concern? A. Acceptance testing is to be managed by users. B. A quality plan is not part of the contracted deliverables. C. Not all business functions will be available on initial implementation. D. Prototyping is being used to confirm that the system meets business requirements.
Which of the following choices BEST ensures the effectiveness of controls related to interest calculation inside an accounting system? A. Re-performance B. Process walk-through C. Observation D. Documentation review
The primary role of an IS auditor during the system design phase of an application development project is to: A. advise on specific and detailed control procedures. B. ensure the design accurately reflects the requirement. C. ensure all necessary controls are included in the initial design. D. advise the development manager on adherence to the schedule.
When performing an audit of access rights, an IS auditor should be suspicious of which of the following if allocated to a computer operator? A. READ access to data B. DELETE access to transaction data files C. Logged READ/EXECUTE access to programs D. UPDATE access to job control language/script files
The responsibilities of a disaster recovery relocation team include: A. obtaining, packaging and shipping media and records to the recovery facilities, as well as establishing and overseeing an offsite storage schedule. B. locating a recovery site if one has not been predetermined and coordinating the transport of company employees to the recovery site. C. managing the relocation project and conducting a more detailed assessment of the damage to the facilities and equipment. D. coordinating the process of moving from the hot site to a new location or to the restored original location.