If inadequate, which of the following would be the MOST
likely contributor to a denial-of-service attack?
A. Router configuration and rules
B. Design of the internal network
C. Updates to the router system software
D. Audit testing and review techniques
Answers were Sorted based on User's Feedback
Answer / guest
Answer: A
Inadequate router configuration and rules would lead to an
exposure to denial-of-service attacks. Choices B and C would
be lesser contributors. Choice D is incorrect because audit
testing and review techniques are applied after the fact.
| Is This Answer Correct ? | 6 Yes | 0 No |
While reviewing the business continuity plan of an organization, the IS auditor observed that the organization's data and software files are backed up on a periodic basis. Which characteristic of an effective plan does this demonstrate? A. Deterrence B. Mitigation C. Recovery D. Response
After implementation of a disaster recovery plan (DRP), pre-disaster and post-disaster operational cost for an organization will: A. decrease. B. not change (remain the same). C. increase. D. increase or decrease depending upon nature of the business.
Which of the following represents the MOST pervasive control over application development? A. IS auditors B. Standard development methodologies C. Extensive acceptance testing D. Quality assurance groups
In a client-server architecture, a domain name service (DNS) is MOST important because it provides the: A. address of the domain server. B. resolution service for the name/address. C. IP addresses for the Internet. D. domain name system.
Which of the following IS functions may be performed by the same individual, without compromising on control or violating segregation of duties? A. Job control analyst and applications programmer B. Mainframe operator and system programmer C. Change/problem and quality control administrator D. Applications and system programmer
Which of the following would an IS auditor consider to be the MOST important to review when conducting a business continuity audit? A. A hot site is contracted for and available as needed. B. A business continuity manual is available and current. C. Insurance coverage is adequate and premiums are current. D. Media backups are performed on a timely basis and stored offsite.
A primary function of risk management is the identification of cost-effective controls. In selecting appropriate controls, which of the following methods is best to study the effectiveness of adding various safeguards in reducing vulnerabilities? A. "What if" analysis B. Traditional cost/benefit analysis C. Screening analysis D. A "back-of-the-envelope" analysis
A data warehouse is: A. object orientated. B. subject orientated. C. departmental specific. D. a volatile databases.
To prevent unauthorized entry to the data maintained in a dial-up fast response system, an IS auditor should recommend: A. online terminals be placed in restricted areas. B. online terminals be equipped with key locks. C. ID cards be required to gain access to online terminals. D. online access be terminated after three unsuccessful attempts.
Compensating controls are intended to: A. reduce the risk of an existing or potential control weakness. B. predict potential problems before they occur. C. remedy problems discovered by detective controls. D. report errors or omissions.
As a result of a business process reengineering (BPR) project: A. an IS auditor would be concerned with the key controls that existed in the prior business process and not those in the new process. B. system processes are automated in such a way that there are more manual interventions and manual controls. C. the newly designed business processes usually do not involve changes in the way(s) of doing business. D. advantages usually are realized when the reengineering process appropriately suits the business and risk.
In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.