The BEST time to perform a control self-assessment involving
line management, line staff and the audit department is at
the time of:

A. compliance testing.

B. the preliminary survey.

C. substantive testing.

D. the preparation of the audit report.



The BEST time to perform a control self-assessment involving line management, line staff and the au..

Answer / guest

Answer: B

Control self-assessment is a process in which the auditor
can get the auditees together, understand the business
process, define the controls and generate an assessment of
how well the controls are working. This is accomplished
ideally during the preliminary data gathering phase. Choices
A, C, D are audit steps that are performed after a control
self-assessment has been completed.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

The corporate office of a company having branches worldwide, developed a control self-assessment program (CSA) for all its offices. Which of the following is the MOST important requirement for a successful CSA? A. Skills of the workshop facilitator B. Simplicity of the questionnaire C. Support from the audit department D. Involvement of line managers

1 Answers  


The general ledger setup function in an enterprise resource package (ERP) allows for setting accounting periods. Access to this function has been permitted to users in finance, the warehouse and order entry. The MOST likely reason for such broad access is the: A. need to change accounting periods on a regular basis.. B. requirement to post entries for a closed accounting period. C. lack of policies and procedures for the proper segregation of duties. D. need to create/modify the chart of accounts and its allocations.

1 Answers  


The PRIMARY objective of a business continuity and disaster recovery plan should be to: A. safeguard critical IS assets. B. provide for continuity of operations. C. minimize the loss to an organization. D. protect human life.

2 Answers  


Connection-oriented protocols in the TCP/IP suite are implemented in the: A. transport layer. B. application layer. C. physical layer. D. network layer.

1 Answers  


A data center has a badge-entry system. Which of the following is MOSTimportant to protect the computing assets in the center? A. Badge readers are installed in locations where tampering would be noticed B. The computer that controls the badge system is backed up frequently C. A process for promptly deactivating lost or stolen badges exists D. All badge entry attempts are logged

5 Answers  






When auditing the requirements phase of a system development project, an IS auditor would: A. assess the adequacy of audit trails. B. identify and determine the criticality of the need. C. verify cost justifications and anticipated benefits. D. ensure that control specifications have been defined.

1 Answers  


The FIRST task an IS auditor should complete when performing an audit in an unfamiliar area is to: A. design the audit programs for each system or function involved. B. develop a set of compliance tests and substantive tests. C. gather background information pertinent to the new audit. D. assign human and economical resources.

1 Answers  


In a risk-based audit approach, an IS auditor should FIRST complete :

7 Answers  


A malicious code that changes itself with each file it infects is called a: A. logic bomb. B. stealth virus. C. trojan horse. D. polymorphic virus.

3 Answers  


A universal serial bus (USB) port: A. connects the network without a network card. B. connects the network with an Ethernet adapter. C. replaces all existing connections. D. connects the monitor.

1 Answers  


The difference between a vulnerability assessment and a penetration test is that a vulnerability assessment: A. searches and checks the infrastructure to detect vulnerabilities, whereas penetration testing intends to exploit the vulnerabilities to probe the damage that could result from the vulnerabilities. B. and penetration tests are different names for the same activity. C. is executed by automated tools, whereas penetration testing is a totally manual process. D. is executed by commercial tools, whereas penetration testing is executed by public processes.

1 Answers  


To reduce the possibility of losing data during processing, the FIRST point at which control totals should be implemented is: A. during data preparation. B. in transit to the computer. C. between related computer runs. D. during the return of the data to the user department.

2 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)