Capacity monitoring software is used to ensure:
A. maximum use of available capacity.
B. that future acquisitions meet user needs.
C. concurrent use by a large number of users.
D. continuity of efficient operations.
Answers were Sorted based on User's Feedback
Answer / guest
Answer: D
Capacity monitoring software shows the actual usage of
online systems versus their maximum capacity. The aim is to
enable software support staff to ensure that efficient
operation, in the form of response times, is maintained in
the event that use begins to approach the maximum available
capacity. Systems should never be allowed to operate at
maximum capacity. Monitoring software is intended to prevent
this. Although the software reports may be used to support a
business case for future acquisitions, it would not provide
information on the effect of user requirements and it would
not ensure concurrent usage of the system by users, other
than to highlight levels of user access.
| Is This Answer Correct ? | 6 Yes | 1 No |
To check the performance of flow and error control, an IS auditor should focus the use of a protocol analyzer on which of the following layers? A. Network B. Transport C. Data link D. Application
Which of the following processes describes risk assessment? Risk assessment is: A. subjective. B. objective. C. mathematical. D. statistical.
Without causing a conflict of interest, a duty compatible with those of a security administrator would be: A. quality assurance. B. application programming. C. systems programming. D. data entry.
Which of the following is a function of an IS steering committee? A. Monitoring vendor controlled change control and testing B. Ensuring a separation of duties within the information's processing environment C. Approving and monitoring major projects, the status of IS plans and budgets D. Responsible for liaison between the IS department and the end users
During which of the following phases in systems development would user acceptance test plans normally be prepared? A. Feasibility study B. Requirements definition C. Implementation planning D. Post-implementation review
During the review of a biometrics system operation, the IS auditor should FIRST review the stage of: A. enrollment. B. identification. C. verification. D. storage.
An IS auditor reviewing back-up procedures for software need only determine that: A. object code libraries are backed up. B. source code libraries are backed up. C. both object and source codes libraries are backed up. D. program patches are maintained at the originating site.
Which of the following activities should the business continuity manager perform FIRST after the replacement of hardware at the primary information processing facility? A. Verify compatibility with the hot site. B. Review the implementation report. C. Perform a walk-through of the DRP. D. Update the IS assets inventory.
If a database is restored using before-image dumps, where should the process be restarted following an interruption? A. Before the last transaction B. After the last transaction C. The first transaction after the latest checkpoint D. The last transaction before the latest checkpoint
An IS auditor performing a review of the IS department discovers that formal project approval procedures do not exist. In the absence of these procedures the IS manager has been arbitrarily approving projects that can be completed in a short duration and referring other more complicated projects to higher levels of management for approval. The IS auditor should recommend as a FIRST course of action that: A. users participate in the review and approval process. B. formal approval procedures be adopted and documented. C. projects be referred to appropriate levels of management for approval. D. the IS manager's job description be changed to include approval authority.
In a risk-based audit approach, an IS auditor, in addition to risk, would be influenced by: A. the availability of CAATs. B. management's representation. C. organizational structure and job responsibilities. D. the existence of internal and operational controls
The responsibilities of a disaster recovery relocation team include: A. obtaining, packaging and shipping media and records to the recovery facilities, as well as establishing and overseeing an offsite storage schedule. B. locating a recovery site if one has not been predetermined and coordinating the transport of company employees to the recovery site. C. managing the relocation project and conducting a more detailed assessment of the damage to the facilities and equipment. D. coordinating the process of moving from the hot site to a new location or to the restored original location.