A control that detects transmission errors by appending
calculated bits onto the end of each segment of data is
known as a:

A. reasonableness check.

B. parity check.

C. redundancy check.

D. check digits.

Answers were Sorted based on User's Feedback



A control that detects transmission errors by appending calculated bits onto the end of each segmen..

Answer / andreas

This describes REDUNDANCY CHECK. Choice C. Previous answer
is wrong.

Is This Answer Correct ?    10 Yes 1 No

A control that detects transmission errors by appending calculated bits onto the end of each segmen..

Answer / guest

Answer: A

A redundancy check detects transmission errors by appending
calculated bits onto the end of each segment of data. A
reasonableness check compares data to predefined
reasonability limits or occurrence rates established for the
data. A parity check is a hardware control that detects data
errors when data are read from one computer to another, from
memory or during transmission. Check digits detect
transposition and transcription errors.

Is This Answer Correct ?    7 Yes 4 No

Post New Answer

More CISA Certification Interview Questions

An IT steering committee would MOST likely perform which of the following functions? A. Placement of a purchase order with the approved IT vendor B. Installation of systems software and application software C. Provide liaison between IT department and user department D. Interview staff for the IT department

1 Answers  


Which of the following audit techniques would an IS auditor place the MOST reliance on when determining whether an employee practices good preventive and detective security measures? A. Observation B. Detail testing C. Compliance testing D. Risk assessment

1 Answers  


52. Which of the following tests confirm that the new system can operate in its target environment?

1 Answers  


Without causing a conflict of interest, a duty compatible with those of a security administrator would be: A. quality assurance. B. application programming. C. systems programming. D. data entry.

1 Answers  


Connection-oriented protocols in the TCP/IP suite are implemented in the: A. transport layer. B. application layer. C. physical layer. D. network layer.

1 Answers  






An IS auditor should be able to identify and evaluate various types of risks and their potential effects. Which of the following risks is associated with authorized program exits (trap doors)? A. Inherent B. Detection C. Audit D. Error

2 Answers  


IS auditors reviewing access control should review data classification to ensure that encryption parameters are classified as: A. sensitive. B. confidential. C. critical. D. private.

1 Answers  


Where adequate segregation of duties between operations and programming are not achievable, the IS auditor should look for: A. compensating controls. B. administrative controls. C. corrective controls. D. access controls.

1 Answers  


The process of using interpersonal communication skills to get unauthorized access to company assets is called: A. wire tapping. B. trap doors. C. war dialing. D. social engineering.

1 Answers  


The initial step in establishing an information security program is the: A. development and implementation of an information security standards manual. B. performance of a comprehensive security control review by the IS auditor. C. adoption of a corporate information security policy statement. D. purchase of security access control software.

2 Answers  


Various standards have emerged to assist IS organizations in achieving an operational environment that is predictable, measurable and repeatable. The standard that provides the definition of the characteristics and the associated quality evaluation process to be used when specifying the requirements for and evaluating the quality of software products throughout their life cycle is: A. ISO 9001. B. ISO 9002. C. ISO 9126. D. ISO 9003.

2 Answers  


Which of the following BEST describes the objectives of following a standard system development methodology? A. To ensure that appropriate staffing is assigned and to provide a method of controlling costs and schedules B. To provide a method of controlling costs and schedules and to ensure communication among users, IS auditors, management and IS personnel C. To provide a method of controlling costs and schedules and an effective means of auditing project development D. To ensure communication among users, IS auditors, management and personnel and to ensure that appropriate staffing is assigned

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)