Which of the following would MOST likely ensure that a
system development project meets business objectives?
A. Maintenance of program change logs
B. Development of a project plan identifying all development
activities
C. Release of application changes at specific times of the year
D. User involvement in system specification and acceptance
Answers were Sorted based on User's Feedback
Answer / guest
Answer: D
Effective user involvement (choice D) is the most critical
factor in ensuring that the application meets business
objectives. Choices A, B and C are project management tools
and techniques and are not of themselves methods for
ensuring that the business objectives are met by the
application system.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / antoine
D. User involvement in system specification and acceptance
| Is This Answer Correct ? | 1 Yes | 0 No |
In a business continuity plan, there are several methods of providing telecommunication continuity. One method is diverse routing which involves: A. providing extra capacity with the intent of using the surplus capacity should the normal primary transmission capability not be available. B. routing information via other alternate media such as copper cable or fiber optics. C. providing diverse long-distance network availability utilizing T-1 circuits among the major long-distance carriers. D. routing traffic through split-cable facilities or duplicate-cable facilities.
An audit charter should: A. be dynamic and change often to coincide with the changing nature of technology and the audit profession. B. clearly state audit objectives for the delegation of authority for the maintenance and review of internal controls. C. document the audit procedures designed to achieve the planned audit objectives. D. outline the overall authority, scope and responsibilities of the audit function.
In an EDI process, the device which transmits and receives electronic documents is the: A. communications handler. B. EDI translator. C. application interface. D. EDI interface.
The MOST appropriate person to chair the steering committee for a system development project with significant impact on a business area would be the: A. business analyst. B. chief information officer. C. project manager. D. executive level manager.
Which of the following provides nonrepudiation services for e-commerce transactions? A. Public key infrastructure (PKI) B. Data encryption standard (DES) C. Message authentication code (MAC) D. Personal identification number (PIN)
Which of the following is a role of an IS steering committee? A. Initiate computer applications. B. Ensure efficient use of data processing resources. C. Prepare and monitor system implementation plans. D. Review the performance of the systems department.
Which of the following is the MOST important issue to the IS auditor in a business process re-engineering (BPR) project would be? A. The loss of middle management, which often is a result of a BPR project B. That controls are usually given low priority in a BPR project C. The considerable negative impact that information protection could have on BPR D. The risk of failure due to the large size of the task usually undertaken in a BPR project
When auditing a mainframe operating system, what would the IS auditor do to establish which control features are in operation? A. Examine the parameters used when the system was generated B. Discuss system parameter options with the vendor C. Evaluate the systems documentation and installation guide D. Consult the systems programmers
Which of the following is an objective of a control self-assessment (CSA) program? A. Audit responsibility enhancement B. Problem identification C. Solution brainstorming D. Substitution for an audit
During an audit of an enterprise that is dedicated to e-commerce, the IS manager states that digital signatures are used in the establishment of its commercial relations. To substantiate this, the IS auditor must prove that which of the following is used? A. A biometric, digitalized and encrypted parameter with the customer's public key B. A hash of the data that is transmitted and encrypted with the customer's private key C. A hash of the data that is transmitted and encrypted with the customer's public key D. The customer's scanned signature, encrypted with the customer's public key
An IS auditor should be concerned when a telecommunication analyst: A. monitors systems performance and tracks problems resulting from program changes. B. reviews network load requirements in terms of current and future transaction volumes. C. assesses the impact of the network load on terminal response times and network data transfer rates. D. recommends network balancing procedures and improvements.
Change management procedures are established by IS management to: A. control the movement of applications from the test environment to the production environment. B. control the interruption of business operations from lack of attention to unresolved problems. C. ensure the uninterrupted operation of the business in the event of a disaster. D. verify that system changes are properly documented.