Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A number of system failures are occurring when corrections
to previously detected errors are resubmitted for acceptance
testing. This would indicate that the maintenance team is
probably not adequately performing which of the following
types of testing?

A. Unit testing

B. Integration testing

C. Design walk-throughs

D. Configuration management



A number of system failures are occurring when corrections to previously detected errors are resubm..

Answer / guest

Answer: B

A common system maintenance problem is that errors are often
corrected quickly (especially when deadlines are tight),
units are tested by the programmer, and then transferred to
the acceptance test area. This often results in system
problems that should have been detected during integration
or system testing. Integration testing aims at ensuring that
the major components of the system interface correctly.

Is This Answer Correct ?    11 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following BEST determines that complete encryption and authentication protocols exist for protecting information while transmitted? A. A digital signature with RSA has been implemented. B. Work is being done in tunnel mode with the nested services of AH and ESP C. Digital certificates with RSA are being used. D. Work is being done in transport mode, with the nested services of AH and ESP

1 Answers  


Which of the following should be in place to protect the purchaser of an application package in the event that the vendor ceases to trade? A. Source code held in escrow. B. Object code held by a trusted third party. C. Contractual obligation for software maintenance. D. Adequate training for internal programming staff.

1 Answers  


A vendor/contractor?s performance against service level agreements must be evaluated by the: A. customer. B. contractor. C. third-party. D. contractor?s management.

1 Answers  


Which of the following describes a difference between unit testing and system testing? A. Unit testing is more comprehensive. B. Programmers are not involved in system testing. C. System testing relates to interfaces between programs. D. System testing proves user requirements are complete.

2 Answers   IBM,


An IS auditor should use statistical sampling and not judgmental (nonstatistical) sampling, when: A. the probability of error must be objectively quantified. B. the auditor wants to avoid sampling risk. C. generalized audit software is unavailable. D. the tolerable error rate cannot be determined.

1 Answers  


An enterprise has established a steering committee to oversee its e-business program. The steering committee would MOST likely be involved in the: A. documentation of requirements. B. escalation of project issues. C. design of interface controls. D. specification of reports.

1 Answers  


Corrective action has been taken by an auditee immediately after the identification of a reportable finding. The auditor should: A. include the finding in the final report because the IS auditor is responsible for an accurate report of all findings. B. not include the finding in the final report because the audit report should include only unresolved findings. C. not include the finding in the final report because corrective action can be verified by the IS auditor during the audit. D. include the finding in the closing meeting for discussion purposes only.

2 Answers  


The PRIMARY objective of a business continuity and disaster recovery plan should be to: A. safeguard critical IS assets. B. provide for continuity of operations. C. minimize the loss to an organization. D. protect human life.

2 Answers  


Disaster recovery planning for a company's computer system usually focuses on: A. operations turnover procedures. B. strategic long-range planning. C. the probability that a disaster will occur. D. alternative procedures to process transactions.

1 Answers  


An IS auditor reviewing an organization's IT strategic plan should FIRST review: A. the existing IT environment. B. the business plan. C. the present IT budget. D. current technology trends.

1 Answers  


A decrease in amplitude as a signal propagates along a transmission medium is known as: A. noise. B. crosstalk. C. attenuation. D. delay distortion.

1 Answers  


During a review of a large data center an IS auditor observed computer operators acting as backup tape librarians and security administrators. Which of these situations would be MOST critical to report? A. Computer operators acting as tape librarians B. Computer operators acting as security administrators C. Computer operators acting as a tape librarian and security administrator D. It is not necessary to report any of these situations.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)