A number of system failures are occurring when corrections
to previously detected errors are resubmitted for acceptance
testing. This would indicate that the maintenance team is
probably not adequately performing which of the following
types of testing?

A. Unit testing

B. Integration testing

C. Design walk-throughs

D. Configuration management



A number of system failures are occurring when corrections to previously detected errors are resubm..

Answer / guest

Answer: B

A common system maintenance problem is that errors are often
corrected quickly (especially when deadlines are tight),
units are tested by the programmer, and then transferred to
the acceptance test area. This often results in system
problems that should have been detected during integration
or system testing. Integration testing aims at ensuring that
the major components of the system interface correctly.

Is This Answer Correct ?    11 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Data edits are an example of: A. preventive controls. B. detective controls. C. corrective controls. D. compensating controls.

2 Answers  


A data center has a badge-entry system. Which of the following is MOSTimportant to protect the computing assets in the center? A. Badge readers are installed in locations where tampering would be noticed B. The computer that controls the badge system is backed up frequently C. A process for promptly deactivating lost or stolen badges exists D. All badge entry attempts are logged

5 Answers  


During the course of an audit, the IS auditor discovers that the human resources (HR) department uses a cloud-based application to manage employee records. The HR department engaged in a contract outside of the normal vendor management process and manages the application on its own. Which of the following choices is of MOST concern? A. Maximum acceptable downtime metrics have not been defined in the contract. B. The IT department does not manage the relationship with the cloud vendor. C. The help desk call center is in a different country, with different privacy requirements. D. Company-defined security policies are not applied to the cloud application.

1 Answers  


The PRIMARY advantage of a continuous audit approach is that it: A. does not require an IS auditor to collect evidence on system reliability while processing is taking place. B. requires the IS auditor to review and follow up immediately on all information collected. C. can improve system security when used in time-sharing environments that process a large number of transactions. D. does not depend on the complexity of an organization's computer systems.

3 Answers  


Which of the following would MOST likely ensure that a system development project meets business objectives? A. Maintenance of program change logs B. Development of a project plan identifying all development activities C. Release of application changes at specific times of the year D. User involvement in system specification and acceptance

2 Answers  






The most common reason for the failure of information systems to meet the needs of users is that: A. user needs are constantly changing. B. the growth of user requirements was forecast inaccurately. C. the hardware system limits the number of concurrent users. D. user participation in defining the system's requirements was inadequate.

1 Answers  


Which of the following is MOST important to have provided for in a disaster recovery plan? A. Backup of compiled object programs B. Reciprocal processing agreement C. Phone contact list D. Supply of special forms

1 Answers  


Which of the following is a data validation edit and control? A. Hash totals B. Reasonableness checks C. Online access controls D. Before and after image reporting

1 Answers  


Congestion control is BEST handled by which OSI layer? A. Data link B. Session layer C. Transport layer D. Network layer

3 Answers  


The use of coding standards is encouraged by IS auditors because they: A. define access control tables. B. detail program documentation. C. standardize dataflow diagram methodology. D. ensure compliance with field naming conventions.

1 Answers  


An IS auditor who is participating in a systems development project should: A. recommend appropriate control mechanisms regardless of cost. B. obtain and read project team meeting minutes to determine the status of the project. C. ensure that adequate and complete documentation exists for all project phases. D. not worry about his/her own ability to meet target dates since work will progress regardless.

1 Answers  


A decision support system (DSS): A. is aimed at solving highly structured problems. B. combines the use of models with nontraditional data access and retrieval functions. C. emphasizes flexibility in the decision making approach of users. D. supports only structured decision-making tasks.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)