What are the different phases in Software life cycle
Answers were Sorted based on User's Feedback
Answer / tushar l
Planning
Analysis
design
coding
testing
Implementation
maintenance
,,,,,,,,,,,,
| Is This Answer Correct ? | 15 Yes | 3 No |
Answer / arunan
The different phases of software life cycle is requirement
engineering, design, coding, integration, delivery and
maintainance with each phase having testing for verification
and validation of the products coming out of each phase.
| Is This Answer Correct ? | 13 Yes | 6 No |
Answer / guest
1. Requirement analysis
2. Designing
3. Coding
4. Testing
5. Maintainence
| Is This Answer Correct ? | 9 Yes | 5 No |
Answer / hadijah
planning
analysis
design
implementation
maintenance
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / mohan
In easy words, The stages in a SDLC are:
1) Requirement analysis.
2) Coding
3) Testing
4) Maintainence.
| Is This Answer Correct ? | 7 Yes | 6 No |
Answer / avinash
1)Engineering
a)Inception
b)Elaboration
2)Production
a)Construction
b)Transition
| Is This Answer Correct ? | 3 Yes | 4 No |
What are the two data table in Microsoft Project 2007?
When you come in to the office, how do you know what you have to do during the day?
Where and how are the risks associated with your project identified and documented?
Scenario: -------- -- You are a project manager in a large software house of 375 staff in total. The company has been running for 5 years. The company has been CMM assessed at level 3. The company has many external clients for whom it develops a wide range of business applications. -- Most of the company‘s applications are developed in Java. The waterfall lifecycle development model is normally used in developments. -- The company has historically suffered from the type of problems that are common in the software industry. In particular systems have been delivered not always to user requirements and containing faults. The managing director of the company is very keen for improvements to be made in these areas. -- You are in charge of a project team of 8 developers, 2 requirements engineers and 3 testers. Your team is just about to start a new development. System to Develop :( Exact Question ) ------------------------------------- -- Your team is about to start to develop a novel vehicle navigation system for physically impaired drivers. The navigation system not only identifies the correct route for the driver in the normal way, but also controls the steering wheel to navigate the car to the destination identified by the driver. -- A basic statement of requirements has been received from the customer and budget and timescales have been formalised into a contract. Requires TASK to write : ------------------------ -- You must write a short report (maximum of 1 page) for the managing director of your company outlining how you propose to ensure that this project improves on previous projects in terms of delivering to user requirements and without faults. Your report must include how you propose to show improvement on these issues to your managing director. Also please tell me how should I choose the best software model when given scenarios like these ...?
How do you track the technical activities in your project? How is the status of the project communicated to the team?
How do you track the size or changes to size of the work products in your project?
What are the different phases in Software life cycle
What is the stage when code is delivered to the client and he is testing it ?
What and where are the policy statements for software project planning?
Explain dll hell?
funds flows analysis how to prepare for interview
How would you deal with changes being made a week or so before the ship date?