Civil Engineering Interview Questions
Questions Answers Views Company eMail

What is the difference between absorption & adsorption and sorption?

830

How much does the leaning tower of pisa lean?

729

How many kilo-newtons equals 1000 kilogram?

766

What is diversion tunnel in a dam?

795

What is the force exerted by the tacoma narrows bridge?

849

What is the biggest dam in america?

770

What glue is least sticky?

780

What is the minimum size of the particles of silt soil?

914

What are the main reasons for conducting pull-out tests for soil nails?

819

Are cruise ships built for the transatlantic run?

836

Where is the worlds longest elevator and how long is it?

794

What are some structures that may be subjected to fatigue?

740

How do you compute volume of airflow?

782

Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

767

What is the best type of wood glue?

787


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

Reinforcement details at hinged joint

2773


What expenses counted in contingencies and how much it is in related to built-up area of the building.

1399


what is stressing

5977


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

3433


Can inverted beams used in pipes during construction?

962






what is the ingredient value of 40mm and 20mm aggregates?

1658


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1751


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

2065


silt%= silt volume/ silt+sand volume is this right?

1625


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1640


When column of building is abutting the boundary line,then suitable footing advised is

2072


Draw the cross section of a boundary wall and label its part with detailing?

4249


What is reinforced concrete?

774


what is flexible and rigid footing?

1979


can i get civil engineering test papers.......?????

2010