In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
640Post New Civil Engineering Questions
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
which has high compressive strength between hollow block and brick masonry?
what is Bearing Capacity,How to determine it?
What are the applications of modulus of elasticity?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
mix design procedure for 1:6 cement mortar
How is make concrete cube?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
What are the uses of groynes?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
where can i get the previous question papers for rrb section enginerr (civil)
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?