Civil Engineering Interview Questions
Questions Answers Views Company eMail

hook and bend length in reinforcement? 

ECCI,

1 3082

why spacer in reinforcement? 

ECCI,

3 2912

how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

965




where are using of one way slab ?

3 3152

what is the thickness of plasters on the external and internal walls at site in india???

GSECL, SSC,

3 3187

standard sand use?

ECCI,

2 2317

 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

Jain Group,

731

what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

Anish Constructions, STUP Consultants Pvt Ltd,

1091




grade of cement used for plastering? why?

NCCL, Green Valley Shelters (P) Ltd,

4 2873

what do u mean by shear?and tension?

Shoba Devlopers, L&T,

6 3652

how to calibrate the RM 800

BNR,

726

what is rebaring?

SSC,

2 14367

what is a weight of 10mm, 20mm, 40mm aggregate ?

1 2460

area of 8mm rod

INDUS,

5 2773

In beams why we give lap in middle of top bars and at edges in bottom bars???

2 2052


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

how to convert cement, sand aggregate quantity from M3 to kg with full description?

786


what is the criteria for the finalisation of pavement thickness in road project?

832


How much cum. Brick work can do by 1 madon

204


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

1285


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

1331






what is meant by shear center?????

1247


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

27031


how many time use of plywood shuttering and IS code

1730


Design a rectangular channel.

1659


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

790


Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000

433


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

554


procedure for preliminary selection of size of column of 5 storey building

1548


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

2475


define the strength

886