Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Testing Interview Questions
Questions Answers Views Company eMail

how can s/w QA process be implemented without reducing productivity?

1 3291

The scenario is "while reviewing requirement docs(SRS)if u find or feel any requirement is not meeting the client's requirements" whom do you report?and what is your action?

7 10685

When does metrics validation occur? 1. Throughout the life cycle 2. During the test 3. After the test 4. During requirements definition 5. After the final software release Justify ur answer with simple explanation.

Olenick, Sigmar, Vidyanikethan,

1 6229

What do you call a collection of descriptions of the data items for the benefit of programmers and others who might need to refer to them? 1. A data dictionary 2. A data model 3. A repository 4. A specification 5. A data map

1 5695

Testing that checks that a modification applied during maintenance has NOT affected the code corresponding to those functions of the system that should be unaffected by the modification is called which one of the following? 1. Acceptance testing 2. Unit testing 3. Regression testing 4. Validation testing 5. System testing

5 7095

Hai can any one tel me what is Concurency Testing?

4 7610

What is validation? 1. The process of determining whether or not the product at a given phase of the lifecycle fulfills the requirements established during the previous phase 2. The process of evaluating software at the end of the software development cycle to ensure compliance with the software requirements 3. The audit and formal examination of the actual as-built software product versus the design documentation and user/support manuals 4. The process of finding solutions to identified defects 5. The process of visibly, traceably, and formally controlling the evolution of software

1 3879

What is the term for decomposing a software program so that latent design information can be extracted? 1. Reengineering 2. Regression 3. Restructuring 4. Reusability 5. Reverse engineering

2224

In the Capability Maturity Model, at which level is effective measurement mastered? 1. Level 1 2. Level 2 3. Level 3 4. Level 4 5. Level 5

2 5026

Which one of the following activities is the most efficient and most cost effective at identifying defects? 1. Prototyping 2. Unit test 3. Beta test 4. Design/code inspection 5. Risk analysis

eFunds,

2082

Which one of the following is used as a tool for tracking an SQA project? 1. Pareto chart 2. PERT chart 3. Run chart 4. Control chart 5. Cause and effect chart

eFunds,

1 4615

The Following Characterstics posses some XYZ company. * Uses formal standards and policies * Conducts software inspections * Has advanced configuration management and change control * Uses CASE tools * Has a software engineering process group * Gathers metrics on process and quality * Requires that developers have formal software engineering training * Practices continued process improvement Based on aboue , Tell me which CMM Level is the company..? 1. Level 1 - Initial 2. Level 2 - Repeatable 3. Level 3 - Defined 4. Level 4 - Managed 5. Level 5 - Optimizing

HCL,

2185

Your audit indicates that the corporate quality management system did NOT work as it should have. How should this finding be categorized? 1. Minor nonconformance 2. Major nonconformance 3. Deficiency 4. Observation 5. Catastrophic failure

2543

I. Customer focus II. Radical process improvement III. Incremental process improvement IV. Quality control specialists are key V. Assumption of unsound processes VI. Human side of quality VII. Measurement and analysis In the statements above, what are the key elements in the TQM philosophy? 1. I, III, VI, and VII 2. I, II, VI, and VII 3. I, II, IV, and VI 4. III, IV, V, and VII 5. I, III, V, and VI

2860

I. Requirements are formally reviewed. II. Requirements are formally approved. III. Requirements are placed under configuration control. IV. Requirements are implemented in code. Using the above statements, when are requirements considered baselined? 1. I and II 2. I, II, and III 3. I, II, III, and IV 4. I only 5. I, III, and IV

2353


Un-Answered Questions { Testing }

What is x-windows?

1143


what is the role of external testing companies?

2048


How can we fetch the page source in selenium?

957


Tell me the SRS based review,brs based review

2237


Best institute for protocol testing in Hyderabad ? How will be the market for protocol testing ?

2197


Hi i am urgently in need of the ISTQB sample exam questions by John A Estrella and Maria C Estrella as i am going to take the exam at the end of this month. Please send the ecopy of this book to tselvi83@yahoo.co.in

2020


Which functionalities of QTP used in banking project?

2448


What are similarities of Agile and Scrum?

3084


How you develop the database vuser script?

1137


What are the views available in quicktest professional?

1017


What is a framework for automation testing?

1079


What does mobile security testing include?

1063


What are the different types goals in goal-oriented scenario?

1077


Hello Varun, Kindly send me the material as well as sample question papers as i am interested in doing the certification. Kindly help me out in this regard. Here is my mail ID: bjyothitesting@gmail.com

2258


What is middle ware testing?? what are the companies using this tech?

2312