C C++ Errors (70)
DotNet Errors (17)
Database Errors (16446)
Scripts Errors (102)
If Fi account is assigned to cost element categorie poatings are not possible it is giving error that cost element has to be assigned to a co object whts the solution for this error?
What is the use of NOLOCK locking hint?
How to view the error log for any specific instance?
What is the major use of Servelet
hi pp gurus, when i do the goods receipt through transiction MIGO the system, gives following error. I filled up all information that needs MIGO transiction. the error is: "Account determination for entry INT GBB___AUF 7900 not possible." can any one suggest me what to do now?
I am Recording the QTP Script..the Script is below VbWindow("mdiPP").VbWindow("frmPOSOLocking").ActiveX ("SSTab").VbListView("lstPO").SetItemState "272 [10-11]", micChecked. After when when Run then give error property not found.
IMG-02003: 2FF03 - incorrect color histogram feature specification
What is the meaning of lock escalation and why/how to stop this?
Dear HCM Gurus: I am facing a problem in PCR as per decisive about deduction wage type restricted as per Government rules that if an employee payment period is < then 15 days then deduction are not required to made from employee, Nomenclature of PCR is: RTE=TKDIVI RTE/2 RTE?TKSOLL < PPPAR U Unpaid absences duing Payroll Period *ADDWT U THEN RTE=TASOLL RTE-GAAU04 RTE*2 RTE?TKDIVI < ADDWT& Variable Table = ADDWT* OT TABLE > ADDWT* OT TABLE SO aforesaid mentioned PCR is applied so when employee Leaving action has been performed on 01.10.2010 and rentry into company is performed on dated 11.10.2010 So sytem is not displaying deduction wage type in LPC but if we perform leaving action on 16.10.2010 then all deduction displayed proportionately because from 01.10.2010 to 16th payment days fullfills but client is insisted that employee leaved company on 01.10.2010 and rejoin company on 11.10.2010 and by this way he worked 21 days in this month thus payment period is not less rather more than 15 days and system should have made deductions. Kindly guide me that how included PCR with Rejoining into comapny so pleases explain nomencalture of PCR if an employee rejoin the company and his payment period fullfill requirement. Kindly help Regards Barket Ali Zafar SAP HR Consultant Siemens Engineering Co Ltd PIFRA Project ,Islamabad +92-300-5521524
Answers for Complete This Song B_C_A_A _IL K_A KA_E, S__AN J__E B__D_ J__E
hi. i m Anil patel when reconcile 57f4 chalan(subcontraction with out excise)i m facing error like short by material 220 kg. even i have migo all material.
invalid quantity specification negative quantity are not allowed for this item please check this item definition quantity
ORA-07497: sdpri: cannot create trace file 'string'; errno = string.
Program ended with error or warning, return code: 4
according to class7 how can we give description on pendrive?