Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
1987We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.
1940how we can calculate the range selection time in mobile communication? or channel searching time?
2232Q.Large no of thyristors are used in HVDC transmission to improve______ a) current rating b) voltage rating c) Thyristers are available at high ratings d)
5 8635If the time delay of relay with TMS setting 0.1 is 10 sec, then what is the time delaty when the TMS setting is changed to 0.5
1 5925Which type of power plant is more easier to produce electrical power at economical condition?
8 10948Post New HAL Interview Questions
What are the ways to Optimize the Performance of a Difference Amplifier?
Is viewdidload only called once?
What are the basic commands in ubuntu?
What are some things I can do in high school to prepare me to study interior design in college?
How to Form Internet (IPv4) Socket Addresses?
Is unix free to use?
Where is the greater than or equal to symbol in excel?
What is the abstraction of Spark Streaming?
Explain the significance of watchdog timer in embedded systems?
Short Answer on _________Business
What= is the 911 point?
What do you mean by term "Annuity"?
How will you define growth and development?
What Is Accrued Income?
Why do you want to leave your present job or company